My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10818
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10818
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2009 11:12:01 PM
Creation date
10/12/2006 4:33:57 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8407.500
Description
Platte River Basin-River Basin General Publications-Missouri River General Publications
Date
10/25/1974
Author
MRBC
Title
1975 Water Assessment-Missouri River Basin-Memorandum of Agreement Between the Missouri River Basin Commission and the US Water Resources Council 3
Water Supply Pro - Doc Type
Operating Principles/Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />review and approval. <br />Subactivity Ten -- Final Documentation of the Difference Between the Modified <br />Central Case and Regional Preference Future <br />During the subactivity the differences in the Modified Central Case and <br />the Regional Preference Future will be documented for each ASA including any <br /> <br />differences in socio-economic and associated water and land utilization pro- <br /> <br />jections, assumptions and methodologies. The staff and regional study <br />director will be responsible for conducting this subactivity. <br />Subactivity Eleven -- Regroup and Screen Problems <br />The problems identified in subactivity two will be regrouped and screened <br />adding and deleting problems as necessary to only include those problems <br />consistent with the results obtained from the Regional Preference Future. <br />This subactivity will be conducted by the staff. <br />Subactivity Twelve -- Develop a Finalized Problem List <br />Using the results of subactivity eleven a finalized problem list will <br />be developed showing the associated problem areas and analytical areas. The <br />problems will be displayed by the time frame that they would become severe <br />if not resolved (i.e. -- 1975-19B5 and 1985-2000) and will be described using <br /> <br />Figures 3 and 4 and a regional map. The problem list will be compiled by the <br />staff for review and supplement by the Group A participants. <br />The results of this activity will be documented in a technical memorandum <br />to be reviewed and approved by the Overview Committee and then transmitted to <br /> <br />WRC. <br /> <br />'~ <br />~ <br />~ <br /> <br />-9- <br /> <br />J <br />
The URL can be used to link to this page
Your browser does not support the video tag.