My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10818
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10818
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2009 11:12:01 PM
Creation date
10/12/2006 4:33:57 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8407.500
Description
Platte River Basin-River Basin General Publications-Missouri River General Publications
Date
10/25/1974
Author
MRBC
Title
1975 Water Assessment-Missouri River Basin-Memorandum of Agreement Between the Missouri River Basin Commission and the US Water Resources Council 3
Water Supply Pro - Doc Type
Operating Principles/Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />" <br />" <br />"': .:::g <br />tJ)1 <br />0i $/ <br />'J <br /> <br />,)~ <br /> <br />Subactivity One -- Participant Selection <br />During this subactivity all of the participants for the National <br />Assessment Study will be selected as outlined in the organizational structure <br />(see Figure 2). Once selected, the names, addresses and professional affiliation <br />of each of the selected participants will be provided to the Water Resources <br /> <br />Council for subsequent referral. <br />The ~'issouri River Basin Commission will serve as the regional sponsor <br /> <br />of the National Assessment. The t1issouri River Basin Commission has delegated <br /> <br />to a Overview Committee the overview responsibility for the National Assessment. <br />The MRBC members will designate the Group A and Group B participants. Group A <br /> <br />participants are planning professionals and Group B participants are the <br />Group A participants plus other participants selected by MRBC members to reDre- <br />,sent functional interests by geographic and/or political areas. <br />Subactivity Two -- pevelop Initial Problem and Issue List <br />During this subactivity an initial problem and issue list will be <br />developed which reflects the occurrence of existing or anticipated future <br />problems (to the year 2000) as a result of the present conditions, the Central <br />Case projections or those that have been identified in completed or ongoing <br /> <br />studies, or other valid sources of information. <br /> <br />Each Group A participant will locate, categorize and briefly describe <br />problems and issues he is aware of as follows (Appendix A lists the definition <br />of terms): <br /> <br />1. Locate each problem within the Missouri River Basin on a single map, <br /> <br />dis~lay the geographic extent of each problem on the map (scale <br />1 to 2.5 million) and key each problem located on the map to <br />Figures 3 and 4. Judgment should be used not to identify too small <br /> <br />or too large of an area. <br /> <br />..' <br />13 '79 <br /> <br />1-5-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.