My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10773
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10773
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:14:39 PM
Creation date
10/12/2006 4:31:47 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8149.911
Description
Miscellaneous Small Projects and Project Studies - SE Needs Assessment and PSOP
State
CO
Basin
Arkansas
Water Division
2
Date
2/28/2001
Author
SE CO Water Activity
Title
Final Draft PSOP Implement Committee Report
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.... <br /> <br />OG8G <br /> <br />PSOP Implementation Committee Report <br /> <br />1. Introduction <br /> <br />The Board of the Southeastern District's Water and Storage Needs <br />Assessment Enterprise voted September 21,2000 to accept the Final Preferred <br />Storage Options Plan Report (PSOP) and the Report's recommendations. The <br />PSOP Report was the culmination of a three-year study effort by water users <br />and others in the Southeastern Colorado Water Conservancy District to <br />determine the best approach to meet future water storage needs. The PSOP <br />Report was developed through the Water and Storage Needs Assessment <br />Enterprise's Storage Study Committee, a committee of local agricultural and <br />municipal water users, recreation and environmental interests, state parks and <br />wildlife agencies, federal agencies, and local citizens. <br /> <br />The recommendations of the PSOP Report included direction to establish an <br />"Implementation Committee" to work on a set of outstanding issues, including <br />the operational details of the PSOP and the terms of proposed memorandum <br />of agreements (MOA) required for participation in the implementation of the <br />PSOP. Those outstanding issues, as reported in the Final PSOP Report <br />include: <br /> <br />1) exact capacity, location, and pnonty uses for the District Water <br />Management Storage (DWMS); <br />2) fmancial responsibilities for the development of the DWMS; <br />3) limitations on the use of enlarged storage space and the requirements <br />for use of re-operations storage; <br />4) commitments to the lOa cfs "minimum target flow" below Pueblo <br />Dam and resulting operational limitations; <br />5) terms and conditions concerning the District's filing for an exchange <br />water right to manage Project Water return flows; <br />6) fmalization of the surcharge schedule; <br />7) the operation of the Winter Water Spill Credit; and <br />8) detennine how to proceed with a water right filing on enlarged storage <br />space <br /> <br />The Implementation Committee (the Committee) was also asked to consider <br />proposals regarding the involvement of the City of Aurora in the development of <br />new storage space under the PSOP. A recommendation on this matter is contained <br />in the Report. <br /> <br />The Implementation Committee has completed their work and presents this PSOP <br />Implementation Committee Report (the Report) and its recommendations in <br />response to the outstanding issues listed above. This Implementation Committee <br />Report is considered an addendum to the Final Preferred Storage Options Plan <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.