<br />/ (Sheet 2 of 2) xiv
<br />( ALL FEDERAL YARDSTICK TRANSMISSION SYSTEM
<br />Colorado River Storage Project Construction Schedule
<br />Transmission Division
<br /> Prices as of Januar 1960
<br /> Estimated
<br /> Cost to Fund Requirement by Fiscal Years
<br /> June 30.
<br />Item 1968 1969 1970 1971 1972 1973 1974 1975 1976 1977
<br />Wood Pole, H-Frame.
<br />Single Circ.Trans.Lines 371,000 545.000 1,027,000 1.122.000 546.000 472.000
<br />Steel Tower Trans. Lines 213,000 250.000 1,300,000 899.000 1.088.000 800,000
<br />Substations 1,651,000 1,281.000 3.379.000 1,878,000 1.635,000 2,153.000 545.000
<br />Service Facilities (Total) 1,484,000 350.000 350.000 350.000 350,000 433.000 100,000 100.000 100,000 50.000
<br />Future Lines & Substations
<br />not Identified 570.000 3.500,000 5.000,000 4.000.000
<br />Total 3,719,000 2.426.000 6,056.000 4,249,000 3,619,000 3,858.000 ' 1,215,000 3.600,000 5.100.000 4,050,000
<br />
<br />I
<br />
<br /> FEDERAL TRANSMISSION SYSTEM UNDER UTILITY PROPOSAL
<br />Colorado River Storage Project Construction Schedule
<br />Transmission Division Prices as of Janua 1960
<br /> Estimated
<br /> Cost to Fund Requirement by Fiscal Years
<br />Item. . June 30, 1974 1975 1976 1977
<br /> 1968 ... 1969 1970 1971 1972 1973
<br />Wood Pole. H-Frame, Single
<br />Circuit Trans. Lines 136,000 0 0 35,QOO 216,000 192,000
<br />Steel Tower Trans. Lines 575,000 175.000 650,000 304,000 0 0
<br />Substations 193,000 330.000 779,000 547.000 493,000 1,059,000 545.000
<br />Service Facilities (Total) 75,000 25.000 100,000 100,000 50.000 42,000
<br />Grand Total 979,000 530,000 1.529,000 . 986,000 . 759,000 1,293,000 545.000