<br />I COLORADO RIVER STORAGE PROJECT AND CENTRAL UTAH PROJECT
<br /> ! xv
<br />I ENERGY GENERATION IN MILLIO!, OF KWH
<br /> Energy at Powerp1ants.:o
<br /> Central Energy
<br />I Calendar Flaming Glen Blue Morrow Utah at
<br />Year Gorge Canyon Mesa Point Crystal prolect Total Loads!/
<br />I 1964 379.0 1,23000 1,609.0 1,496.0
<br />1965 45800 3,923.0 4,381.0 4.074.0
<br /> 1966 457.0 3,943.0 14800 4,548.0 4,23000
<br />I 1967 465.0 4,288.0 22800 4,981.0 4,66000
<br />1968 398.0 4,342.0 29100 5,0:31.0 4,744.0
<br />1969 410.0 4,35000 29800 5.058.0 4,792.0
<br /> 1970 440.0 4,395.0 309.0 309.0 113.0 5,566.0 5,293.0
<br />I 1971 449.0 4,422.0 ~ 401.0 150.0 5,731.0 5,469.0
<br />1972 456.0 4,445.0 \1; ~ 5,761.0 5,516.0
<br /> 1973 498.0 4,470.0 143.0 5,971.0 5,730.0
<br />I 1974 551.0 4,677 .0 400.0 290.0 6,377.0 6,123.0
<br />1975 503.0 4,780.0 276.0 340.0 122.0 292.0 6,313.0 6,035.0
<br />I ~ ~ ~ Curecanti ~ ~ ~
<br /> W
<br />1990 504.0 4,769.3 737.1 28t.8 6,300.2 6,022.4
<br /> ~ '-Ji W t ~ ~
<br />I 2000 495.0 4.684.2 723.9 284.7 6,187.8 5,914.9
<br />-!t '-Ji w t W -!t t
<br /> 2010 484.4 4,584.1 708.5 278.6 6,0~5.6 5,788.5
<br />I .. t t W W W
<br />2020 475.8 4.502.0 695.8 273.6 5,947.2 5,684.9
<br />it t t W W W W
<br /> 2030 469.9 4,446.7 687.3 27002 5.874.1 5,615.1
<br /> W W t -!t W W W
<br /> 2040 466.6 4,414.7 682.3 268.2 5,831.8 5,574.6
<br /> -!- t t W t ~ {
<br /> 2050 463.4 4,385.7 677.9 266.6 5,793.6 5,538.1
<br /> W -l- t W W -!- -!-
<br /> 2060 461.3 4.365.5 674.8 265.2 5,766.8 5,512.5
<br />I .... t ~ t t ! !
<br />2063
<br />I
<br />I 1/ Generation is based on the assumption of occurrence of years of average
<br />I (1906-1959) runoff during the filling period. Generation for 1975 and
<br /> 2020 is the average annual generation for the 54-year period 1906-1959
<br /> inclusive, considering depleted conditions of river flows expected to
<br /> occur by 1975 and 2020 respectively.
<br />I 7=./ It has been assumed that under the 1975 and 2020 conditions off-peak
<br /> energy would be purchased to firm up the project generation in lower
<br />I than average water years. The amounts thus assumed 'to be purchased
<br /> were 284 million kwh in 1975 and 360 million kwh in 2020.