<br />Colorado River Storage Project
<br />Transmission Division
<br />
<br />:~J;J;:em
<br />
<br />Wood Pole. H-Frame, Single
<br />Circuit Transmission Lines
<br />
<br />Steel Tower Transmission Lines
<br />
<br />Total
<br />Cost
<br />
<br />Substations
<br />
<br />19,545,000
<br />86,000,000
<br />52,130,000
<br />5.500.000
<br />
<br />Service Facilities (Total)
<br />
<br />Future Lines and Substations
<br />not Identified
<br />
<br />13,070,000
<br />176,245,000
<br />
<br />747.169
<br />
<br />5,645,767
<br />
<br />15,242,000
<br />
<br />52,389,064
<br />
<br />40,077,000
<br />
<br />4,668,000
<br />
<br />10,596,000
<br />
<br />8,988,000
<br />
<br />Total
<br />
<br /> FEDERAL TRANSMISSION SYSTEM UNDER UTILITY PROPOSAL Construction Schedule
<br /> Colorado River Storage Project
<br /> Transmission Division Prices as of Januar 1960
<br /> Estimated Reqllirement
<br /> Cost to Fund by Fiscal Years
<br /> Total June 30,
<br />Item Cost 1960 1961 1962 1963 1964 1965 1966 1967
<br />Wood Pole, H-Frame, Single 758,000 26,000 132,000 313,000
<br />circuit Transmission Lines 6,876.000 96,000 1,496,000 2,948,000 528,000
<br />Steel Tower Transmission Lines 32,745,000 417,000 3,741,000 7,210,000 9,803,000 8,485,000 0 539,000 846,000
<br />Substations 15,924,000 209,169 350,767 1,718,000 4,431,064 3,560,000 300,000 900,000 509.000
<br />Service Facilities (Total) 2,225.000 25,000 58,000 400,000 400,000 500.000 200,000 200,000 50,000
<br />Grand Total 57,770,000 747,169 5,645,767 12.1276.000 15,162,064 13,303,000 526,000 1.771,000 1,718,000