<br />Dallas Creek Project: Ridgway Dam Em-
<br />bankment topped out July 23, 1986. Work
<br />on the rivel outlet works and instrumenta-
<br />tion continued. Water started lilllng be-
<br />hind the dam in early 1987. The reservOIr
<br />will11ave a surface area 01 1,030 acres.
<br />
<br />Construction tOlallng $19.6 million was
<br />completed
<br />
<br />Seedskadee Project: Spring runoll into
<br />Fontenelle Reservoir in southwestern
<br />Wyoming was 167 percent of normal. The
<br />dam"s outlets were operating at maxi-
<br />mum capacity but the Inllows still ex-
<br />ceeded the outlet capacity. The high run-
<br />011 swept debris Into the reservoir.
<br />partially clogging the trash racks of the
<br />outlet works. Divers were enlisted to diS-
<br />lodge the debris which was curlaillng Ihe
<br />planned releases flam tile reservoir. The
<br />oullet works were closed during the div-
<br />ing operation
<br />Salety 01 Dams work on the test section
<br />01 Fontenelle Dam started in 1985. The
<br />work is not lunded by tl1e CRSP. The
<br />results ot this contract. currently valued
<br />at $6.7 million, will determine how the
<br />final repair 01 tl1e dam will be accom-
<br />plished. The work was 95 percent com-
<br />plete by the end 01 H1e liscal year. As a
<br />result of the low reselvolr elevation, Ihe
<br />powerplant at Fontenelle is not In use.
<br />
<br />Navajo Storage Unit: Investigations,
<br />which were completed In 1984. into seep-
<br />age at Navajo Dam Ilave been underway
<br />Since it first filled. Subsequent investiga-
<br />tive reports recommended that allhough
<br />no damage to the core 01 the dam has
<br />been idenlllled, a construction program
<br />be initiated to conlrol tile seepage. A con-
<br />lract lor the construction 01 a concrete
<br />diaphragm wafl in the lell abutment was
<br />awarded in September 1986 for
<br />$9,756,000. A series 01 pipes, drains and
<br />drainage tunnels will be installed on the
<br />right abutment.
<br />
<br />8
<br />
<br />Estimated Contruction Costs of Colorado River Storage Project
<br />and Participating Projects (Section 5 and Section 8 Facilities wilh ProJected
<br />Increases from 1956 (initial) to Project Completion.
<br />Ccsl PrOjections as of Seplember 30, 1986.)
<br />
<br /> 60
<br /> 55
<br /> 50
<br />'" 4.5
<br />'"
<br />'"
<br />~ 4.0
<br />~
<br />0
<br />0 3.5
<br />~
<br />0
<br />'" 3.0
<br />z
<br />0 2.5
<br />::;
<br />~
<br />10 2.0
<br /> 1.5
<br /> 1.0
<br /> .5
<br /> .0
<br />
<br />$344
<br />II I, MilLION
<br />I~IIIIII" III I ""'-.
<br />II i1ln 11\1 "'-....
<br />....111 I I Additional Section 8 Costs
<br />I II II I II $1.871
<br />I 111111 'I MILlION~ Other Cost Changes
<br />"11111)11 II (Changes Hl Plan. ReaniilYSls of Quantities and Unll
<br />II. or III II Prices. Legislative A(J(jltlons, Unforeseen Condlllons
<br />.11111 etc.1
<br />. I II<
<br />11111111111 II,
<br />1 IIIill1 II 1
<br />IIWollllll1i II,
<br />III I"l I
<br />1.1111 1111('
<br />lII"tl[ 1111] I: I
<br />1I1I1 .
<br />I III1 $709
<br />laJlIlIlll I MILLION
<br />.,[ltlllllllll I
<br />Ihl III
<br />Ift_" III ,.1 $936 _ Inilial Authorizations' (1956)
<br />:::::11::::,11'.111 MILLION StorilQe Units AspmalllCureCilntll. Flarnmg Gorge
<br />G;en Canyon, Navajo
<br />Partic,paIHl\; PrOjeCl$ FIQrlda. Paonia, Silt, Sm.th
<br />Fork, Hammond, Cen1rill Ulah, Emery County Lyman.
<br />Seedskadee.la Barge', Pine River ExtenSion'
<br />
<br />$2.310 ____ Cosllncreases Due To Inflation
<br />MILUON
<br />Subsequtmt New Authorizations
<br />/1962: NavajO Indian IrrlgallOn ProJeC1, San Juan
<br />Chama
<br />1965 BostWick Park, FrullIand Mesa, Savery, POl HOOk
<br />196B An,mas.LdPlata, Ddllas Creek. Dolores. San
<br />Miguel. West DlvicJe"Umlah UnHCUP
<br />
<br />Only $760 M,lli(ln wasorll!ldl'yappl0l1r;aled
<br />by Con9'es5
<br />'Defe1lp<llndehn'IE'I\, In '%2
<br />'[}1'8LJlhorm:W,n 1971
<br />
<br />Construction Costs - Annual and Accumulated
<br /> Annual Accumulated
<br />TranSitional quarler and
<br />liscal year 1977 131,750,705
<br />To date as of September 30, 1977 1,266,144,556
<br />Fiscal year 1978 89,001,375
<br />To dale as of September 30, 1978 1,355,145,931
<br />Fiscal year 1979 95,067,380
<br />To date as of Seplember 30, 1 979 1,450,213,311
<br />Fiscal year 1980 130,357,851
<br />To date as of September 30, 1980 1,580,571,162
<br />Fiscal year 1981 166,678,707
<br />To date as of September 30, 1981 1,747,249,869
<br />Fiscal year 1982 170,316,665
<br />To date as of September 30, 1982 1,917,566,534
<br />Fiscal year 1983 200,673,141
<br />To date as 01 September 30, 1983 2,118,239,675
<br />Fiscal year 1984 193,233.741
<br />To date as 01 September 30, 1984 2,311,473,416
<br />Fiscal year 1985 175,924,067
<br />To date as of September 30, 1985 2,487,397,483
<br />Fiscal year 1986 170,956,660
<br />To date as 01 September 30, 1986 2,658,354,143