<br /> <br />a water distribution system, a pump- <br />house, 15 two-unit comlort stations, and <br />lisherman access facilities are parts at <br />1M contract. <br /> <br />A $600,000 contracl to remove 83,500 <br />tons of gravel lrom the McPhee Reservoir <br />pit was awarded in Oclober 1985 and <br />compleled prior to the end of the fiscal <br />year. A $142,000 contract for modifica- <br />tions to the McPhee Dam spillway was <br />awarded in May. The contract was com- <br />pleted prior to the year's end. The pri- <br />mary purpose at the contract was to <br />install an airslot to reduce cavilation in <br />the spillway. Work on the $3,000,000 <br />contract for Ormiston Point and Lone <br />Dome Roads. which was awarded In Sep- <br />tember 01 1983, was subslantially com- <br />plete by the year's end. <br /> <br />Supplements to the Dolores ProJect <br />Delinite Plan Report and Environmental <br />Impact Statement are being prepared <br />incorporating McElmo Creek Salinity <br />teatu res with Dolores. <br /> <br />Construction inlormation about Grand <br />Valley and Paradox can be lound In the <br />Salinity Section of this publication. <br /> <br />Central Utah Project: Bonneville Unit - <br />The Final Supplement to the Final Envi- <br />ronmental Supplement of the Municipal <br />and Industrial System, Bonneville, Unit <br />Central Utah Project was filed August 28, <br />1986. <br /> <br />Construction work on contracts totaling <br />about $12.5 million continued on several <br />features. SIX new contracts totaling <br />approximalely $6.4 million were awarded <br />during the year. The contracts awarded <br />were as lollows: Rhodes and Win Diver- <br />sions and Pipelines lor $1,350,000 in Sep- <br />lember 1986; Docs Diversion and Feeder <br />Pipeline for $1,527,000 in July 1986; <br />Hades Feeder Pipeline for $2,1 93,000 In <br />June 1986; Landscaping 01 the Duchesne <br />Government Community in November <br /> <br />Upper Slill\'Jilter dalTI. Bonneville Unit. O:;ntral Utah PrOject <br />at the close of C;Ollstructlon season 1986 Roller compacted <br />corlC!(,ie IS being used in tho d<lm <br /> <br />1985 tor $63,000: Strawberry O&M Facili- <br />ties tor $480,000 in May 1986: and Straw- <br />berry Adminislration Building and Fish <br />Strrpping Station for $792,000 In July <br />1986. The $4,484,000 contract lor Sand <br />Production lor Upper Stillwater Dam was <br />about 75 percenl completed by the end <br />of FY 86. The North Fork Siphon contract <br />which was awarded in July 1984, for <br />$5,658,000 was over 85 percent com- <br />pleled by the fiscal year's end. <br /> <br />The $24,436,000 contract for Jordan <br />Aqueduct Reach 4 and Alpine Aqueduct <br />Reach 3 was 90 percent compleled at <br />the end of FY 86. <br /> <br />Docs Feeder Pipeline and Hades Feeder <br />Pipeline were about 30 and 60 percent <br />complete, respectively. <br /> <br />The current contract value tor Upper <br />Stillwater Dam awarded in December <br />1983, is now $77.125,000 and the work <br />was approximately 60 percent complete <br />al Ihe end of FY 86. <br /> <br />The Strawberry O&M Facilities and the <br />Fish Stripping and Administration Build- <br />ings were about 35 and 50 percent com- <br />plete. respectively, at the end 01 FY 86. <br />Jensen Unit - wilh minimal conslructlon, <br />work was substantially complete on both <br />the Tyzack Pumping Plant and on Reach <br />2 01 the Tyzack Aqueduct. <br /> <br />Ulntah Unit - The Bureau of Reclama- <br />tion has proposed nonstructural alterna- <br />tives to meet the terms 01 the Deferral <br />Agreement with the Ute Indian Tribe. The <br />Tribe has not responded to the proposal. <br /> <br />7 <br />