Laserfiche WebLink
<br /> <br />Wayne N. Aspinall Storage Unit: <br />Repairs to Morrow Point Dam Bridge and <br />Road were perlormed tor $485,000 <br /> <br />A lire in the Blue Mesa Powerplant on <br />March 24, 1986, temporarily disabled the <br />powerplant. An electrical fault in an over- <br />head crane caused a fire in a station <br />service board. One 01 the two genera- <br />tors was back in service within a week. <br /> <br />Equipment to restore the planl to opera- <br />tional status was Installed in September <br />and October. Reparrs were $341,000. <br /> <br />Flaming Gorge Storage Unit: A contract <br />for $200,090 for road repairs at Flaming <br />Gorge and Red Fleet Campgrounds was <br />awarded and completed <br /> <br />Glen Canyon Storage Unit; Upratlng <br />and rewinding 01 the generators in the <br />powerplanls was started in November <br />1983 and Will be completed in the spring <br />of 1987. <br /> <br /> <br />9 <br />