My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10517
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10517
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:13:22 PM
Creation date
10/12/2006 4:21:50 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8273.100
Description
Colorado River Basin Salinity Control - Federal Agencies - Bureau of Reclamation
Basin
Colorado Mainstem
Water Division
5
Date
3/6/1984
Title
Status of Colorado River Water Quality Improvement Program and Colorado River Basin Salinity Control Project - Upper Colorado Region - Bureau of Reclamation
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br />C..il <br />Ul <br />0) <br /> <br />. <br /> <br />. <br /> <br />3 <br /> <br />3. <br /> <br />The Planning Report/Draft Environmental Statement is scheduled to be <br /> <br />completed in June 1985. <br /> <br />LOWER GUNNISON BASIN UNIT, COLORADO <br /> <br />1. On January 31, 1984, the Feasibility Report/Final Environmental Statement <br /> <br />was sent to Washington for filing with the Environmental Protection Agency. <br /> <br />2. The Feasibility Report/Final Environmental Statement was filed on February <br /> <br />10, 1984, and is now available to the public. <br /> <br />3. Draft legislation for construction authorization in the Uncompahgre Valley <br /> <br />and a Summary Fact Sheet for Office of Management and Budget (OMB) review <br /> <br />were prepared and sent to Washington on February 28, 1984. <br /> <br />4. Advance planning investigations have started on the winter water portion <br /> <br />of the study and the Advance Planning ,Plan of Study was sent to Washington <br /> <br />for review on February 10, 1984., <br /> <br />5. Tri-County Water Conservancy District has agreed to be the contractor <br /> <br />and do the advance planning investigations for the winter water segment <br /> <br />through a grant with Reclamation. <br /> <br />6. Uncompahgre Valley Water Users Association passed a resolution agreeing <br /> <br />to have Tri-County do the work. <br /> <br />7. Initial investigations are underway on the remaining portion of the unit-- <br /> <br />the Lower Gunnison Basin-North Fork Area. Grand Mesa, Fruitland Mesa, <br /> <br />and Crawford Water Conservancy Districts have been contacted to inform <br /> <br />them of the study and seek ideas on public involvement plan preparation. <br /> <br />MCELMO CREEK UNIT, COLORADO <br /> <br />1. A study to determine the appropriate size to construct the Towaoc Canal- <br /> <br />McElmo Creek combination is underway. <br />
The URL can be used to link to this page
Your browser does not support the video tag.