Laserfiche WebLink
<br /> Table 4. Culture schedule for humpback chub in flow-thru system (Format from Piper <br /> et al. 1982). <br /> Mean Totlal Flow Space <br /> (eC) Number Length \~eigh t Needed Needed <br /> Date Event Location Temperature (thousands) (mm) (pounds) (gpm) (cu'ft) <br />June 1 eg~ <br />ta e <br /> incuba- on <br /> tion screens 18 250 20 <br /> on <br />June 5 hatch screens 18 200 7 20 <br /> swim-up 4 circular <br />June 10 brine shrimp tanks (4' diam) 20 175 10 50 150 <br /> feed-trout 4 circular <br />June 30 starter tanks (8' diam) 25 150 20 22 200 600 <br /> feed ...,trout <br />July 31 III crumble 1 raceway 25 135 38 163 500 1250 <br /> feed-trout <br />Aug. 31 1/2 crumble 2 raceways 25 130 56 503 1000 2500 <br /> transfer or <br />Sept. 20 release 3 raceways 125 75 1200 1500 3750 <br />