Laserfiche WebLink
<br />Table 5. Culture schedule for bony tail chub in flow-thru system. <br /> Mean Total Flow Space <br /> (0 C) Number Length Height Needed Needed <br />Date Event Location Temperature (thousands) (nun) (pounds) (gpm) (cu ft) <br />May 15 egg take on <br /> screens 18 250 <br /> incubation on 20 <br /> screens <br />May 20 hatch On <br /> screens 18 200 7 20 <br />May 25 swim-up 4 circular <br /> feed tanks (4'diam) 20 175 10 50 150 <br /> brine shrimp <br />June 9 feed trout 4 circular 25 150 20 18.5 200 600 <br /> starter tanks (8'diam) <br />July 9 feed trout 1 raceway 25 135 38 114 500 1250 <br /> III crumbles <br />Aug. 8 feed trout 1 raceway 25 130 56 352 500 1250 <br /> 1/2 crumbles <br />S'ept. 6 transf er 2 raceways 25 125 75 800 1000 2500 <br /> or release <br /> <br />" <br />