Laserfiche WebLink
<br />Mr. Paul Petzrick <br />Page 5 <br />June 6, 1979 <br /> <br />(HJ21 '75 <br /> <br />7. Recreation assessment potential and needs prepared by <br />Utah State Parks and Recreation in January. 1978. <br /> <br />8. A proposed action plan report as requested by BLM was <br />completed in March, 1978. <br /> <br />9. Report on peaking power potential of a hydro-electric power <br />plant at White River Dam was completed January. 1978. <br /> <br />" <br /> <br />10. An analysis of land ownership and right-of-way requirements <br />report was completed by Bingham Engineering in April. 1978. <br /> <br />11. Utah State Department of Transportation prepared cost estimated <br />of White River bridge in May, 1978. <br /> <br />12. The 10th Circuit Court ruled in favor of the state of Utah on <br />a law suit over in-lieu selected land in the White River area <br />in August. 1978. <br /> <br />Money the State spent to date on the project: <br /> <br />Date <br /> <br />Engineering Firm <br /> <br />Purpose <br /> <br />Preliminary Site Investigation <br />Subsurface & Surface Invest. <br />Detailed Dam site Investigation, <br />Mapping of Indian Land, Pre- <br />liminary Investigation of Indian <br />Irrigation Project <br />Addendum to contract of 9/76 <br />Hydro-electric Power Feasibility <br />White River Hydro-electric, <br />Power Marketing Study <br /> <br />Amount <br /> <br />Nov. 74 Bingham Engineering <br />June 75 Bingham Engineering <br />Sept. 76* Bingham Engineering <br /> <br />$ 7,000 <br />25,000 <br /> <br />100.000 <br />11 .600 <br />15,000 <br /> <br />May 77* <br />Nov. 77 <br />Jan. 79 <br /> <br />Bingham Engineering <br />Protrans Consultants <br />Bingham Engineering <br /> <br />3,900 <br />$162.500 <br /> <br />*Joint contracts between the Four Corners Regional Commission, <br />Uintah Water Conservancy District. Central Utah Water Conservancy District. <br />Ute Indian Tribe Business Council, Bureau of Indian Affairs and Moon Lake <br />Electric Association. <br /> <br />In addition to the contract studies, the Division of Water Resources <br />has spent several thousand hours in the planning and development of the <br />project between 1970 and the present time. <br /> <br />I hope this information is adequate and will help in having the <br />White River Dam Project included in the "Critical Energy Facility Program". <br />If you need additional information, please contact Mr. Reed Searle of <br />the State Energy Office. <br /> <br />Si ncerely, <br /> <br />Governor <br /> <br />Sf1M/rts <br /> <br />