My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10311
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10311
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:58:15 PM
Creation date
10/12/2006 4:15:54 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8200.765
Description
White River General
State
CO
Basin
Yampa/White
Water Division
6
Date
11/1/1980
Author
Utah Div of Water Re
Title
White River Dam Project - Proposed Action Plan
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Mr. Paul Petzrick <br />Page 5 <br />June 6, 1979 <br /> <br />(HJ21 '75 <br /> <br />7. Recreation assessment potential and needs prepared by <br />Utah State Parks and Recreation in January. 1978. <br /> <br />8. A proposed action plan report as requested by BLM was <br />completed in March, 1978. <br /> <br />9. Report on peaking power potential of a hydro-electric power <br />plant at White River Dam was completed January. 1978. <br /> <br />" <br /> <br />10. An analysis of land ownership and right-of-way requirements <br />report was completed by Bingham Engineering in April. 1978. <br /> <br />11. Utah State Department of Transportation prepared cost estimated <br />of White River bridge in May, 1978. <br /> <br />12. The 10th Circuit Court ruled in favor of the state of Utah on <br />a law suit over in-lieu selected land in the White River area <br />in August. 1978. <br /> <br />Money the State spent to date on the project: <br /> <br />Date <br /> <br />Engineering Firm <br /> <br />Purpose <br /> <br />Preliminary Site Investigation <br />Subsurface & Surface Invest. <br />Detailed Dam site Investigation, <br />Mapping of Indian Land, Pre- <br />liminary Investigation of Indian <br />Irrigation Project <br />Addendum to contract of 9/76 <br />Hydro-electric Power Feasibility <br />White River Hydro-electric, <br />Power Marketing Study <br /> <br />Amount <br /> <br />Nov. 74 Bingham Engineering <br />June 75 Bingham Engineering <br />Sept. 76* Bingham Engineering <br /> <br />$ 7,000 <br />25,000 <br /> <br />100.000 <br />11 .600 <br />15,000 <br /> <br />May 77* <br />Nov. 77 <br />Jan. 79 <br /> <br />Bingham Engineering <br />Protrans Consultants <br />Bingham Engineering <br /> <br />3,900 <br />$162.500 <br /> <br />*Joint contracts between the Four Corners Regional Commission, <br />Uintah Water Conservancy District. Central Utah Water Conservancy District. <br />Ute Indian Tribe Business Council, Bureau of Indian Affairs and Moon Lake <br />Electric Association. <br /> <br />In addition to the contract studies, the Division of Water Resources <br />has spent several thousand hours in the planning and development of the <br />project between 1970 and the present time. <br /> <br />I hope this information is adequate and will help in having the <br />White River Dam Project included in the "Critical Energy Facility Program". <br />If you need additional information, please contact Mr. Reed Searle of <br />the State Energy Office. <br /> <br />Si ncerely, <br /> <br />Governor <br /> <br />Sf1M/rts <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.