My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10152
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10152
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:57:30 PM
Creation date
10/12/2006 4:10:11 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.10.B
Description
UCRBRIP Program Summaries/Status Reports
Basin
Colorado Mainstem
Date
4/15/1996
Author
UCRBRIP
Title
Status Report
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Action: <br />Date: <br /> <br />Post-restoration evaluation of gravel pit at 29 5/8 Road to begin. <br />April 1996. <br /> <br />Action: <br /> <br />Date: <br /> <br />Final report for Phase I of the flood plain issue paper to be completed. <br />Phase I will identify gaps in the habitat restoration program. Committees <br />will decide whether or not to proceed with Phase II, where Colorado and <br />Utah will identify and evaluate cooperative, incentive-based opportunities <br />for protecting the flood plain from further degradation, <br />June 28, 1996. <br /> <br />Action: <br />Date: <br /> <br />Old Charlie Wash scheduled for draining and fish harvest. <br />August 1996. <br /> <br />Action: <br /> <br />Construction of 100 cubic-feet-per-second inlet structure at Walter Walker <br />to be completed. <br />August 1996. <br /> <br />Date: <br /> <br />Action: <br />Date: <br /> <br />Draft contaminants screening reports due for Green River sites. <br />August 1996. <br /> <br />Action: <br />Date: <br /> <br />Environmental compliance report due for Green River sites. <br />August 1996. <br /> <br />Action: <br /> <br />Construction to begin on five to 10 new sites in the Green River including <br />Bonanza Bridge, Horseshoe Bend, the Stirrup, Baeser Bend, Wyasket <br />Bottom, a site adjacent to Old Charlie Wash and possibly Leota Bottom, <br />September 1996. <br /> <br />Date: <br /> <br />Action: <br />Date: <br /> <br />Draft report due for flood-ability analysis of Green River sites. <br />Sept. 30, 1996. <br /> <br />Action: <br />Date: <br /> <br />Refined levee removal strategy for the Gunnison and Colorado rivers due. <br />Sept. 30, 1996, <br /> <br />Action: <br /> <br />Report completed on possible Gunnison and Colorado River flow <br />easements on land that could be used as razorback sucker habitat. <br />Sept. 30, 1996. <br /> <br />Date: <br /> <br />Action: <br /> <br />Transfer of basin-wide monitoring/evaluation program to the Interagency <br />Standardized Monitoring Program wilI begin, <br />Oct. 1, 1996. <br /> <br />Date: <br /> <br />Action: <br /> <br />Construction scheduled to end on the five to 10 new Green River sites <br />identified above, <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.