<br />Action: <br />Date: <br /> <br />Post-restoration evaluation of gravel pit at 29 5/8 Road to begin. <br />April 1996. <br /> <br />Action: <br /> <br />Date: <br /> <br />Final report for Phase I of the flood plain issue paper to be completed. <br />Phase I will identify gaps in the habitat restoration program. Committees <br />will decide whether or not to proceed with Phase II, where Colorado and <br />Utah will identify and evaluate cooperative, incentive-based opportunities <br />for protecting the flood plain from further degradation, <br />June 28, 1996. <br /> <br />Action: <br />Date: <br /> <br />Old Charlie Wash scheduled for draining and fish harvest. <br />August 1996. <br /> <br />Action: <br /> <br />Construction of 100 cubic-feet-per-second inlet structure at Walter Walker <br />to be completed. <br />August 1996. <br /> <br />Date: <br /> <br />Action: <br />Date: <br /> <br />Draft contaminants screening reports due for Green River sites. <br />August 1996. <br /> <br />Action: <br />Date: <br /> <br />Environmental compliance report due for Green River sites. <br />August 1996. <br /> <br />Action: <br /> <br />Construction to begin on five to 10 new sites in the Green River including <br />Bonanza Bridge, Horseshoe Bend, the Stirrup, Baeser Bend, Wyasket <br />Bottom, a site adjacent to Old Charlie Wash and possibly Leota Bottom, <br />September 1996. <br /> <br />Date: <br /> <br />Action: <br />Date: <br /> <br />Draft report due for flood-ability analysis of Green River sites. <br />Sept. 30, 1996. <br /> <br />Action: <br />Date: <br /> <br />Refined levee removal strategy for the Gunnison and Colorado rivers due. <br />Sept. 30, 1996, <br /> <br />Action: <br /> <br />Report completed on possible Gunnison and Colorado River flow <br />easements on land that could be used as razorback sucker habitat. <br />Sept. 30, 1996. <br /> <br />Date: <br /> <br />Action: <br /> <br />Transfer of basin-wide monitoring/evaluation program to the Interagency <br />Standardized Monitoring Program wilI begin, <br />Oct. 1, 1996. <br /> <br />Date: <br /> <br />Action: <br /> <br />Construction scheduled to end on the five to 10 new Green River sites <br />identified above, <br /> <br />4 <br />