My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP10056
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP10056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:57:05 PM
Creation date
10/12/2006 4:05:52 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.500.10
Description
Glenwood-Dotsero Springs Unit - Salinity Control Projects- Aquatrain
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
7/1/1983
Title
Monthly Progress Report - Aquatrain Project - July 1983
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />c- <br />., <br /> <br />~..J'1 <br />~ "'~ <br /> <br />CO2 sources are in the western U.S., adjacent to the proposed <br />pipeline route. <br /> <br />PROPlAN input for Master Schedule has been completed. <br /> <br />(', ') <br /> <br />r ~, <br />,,~ ~.. <br /> <br />Combustion Engineering has designed a fine coal handling <br />system which has been installed in TVA's Bull Run, Tennessee <br />Powerplant (near Chattanooga). It appears that the system <br />can be used to handle AQUATRAIN coal after separation from <br />CO2 at the pipeline terminus. A plant visit can be arranged. <br /> <br />Subteam leader met with ESU, Inc., regarding a proposal <br />for optimizing the AQUATRAIN management system. Vendor <br />suggests savings of 10-20 percent of project costs would <br />be expected. <br /> <br />5.2 ANTICIPATED AUGUST EVENTS <br /> <br />Complete designs and cost estimates of Stage III system to Pacific <br />Coast. <br /> <br />Continue identifying alternative sources of CO2, <br /> <br />Followup with Stearns-Roger on FGD system and coal cleaning technology. <br /> <br />Followup on effectiveness of fine coal handling system at TVA's <br />Bull Run Powerplant. <br /> <br />5.3 ANTICIPATED SEPTEMBER EVENTS <br /> <br />Plan to have better grip on following: <br /> <br />Determining basic cleaning potential of western coal. <br /> <br />Determining how to schedule and track batches of commodities <br />from numerous sources in varying amounts to delivery points in <br />an integrated pipeline system. <br /> <br />Finding sources of CO2 to optimize location, price, reserves, <br />and sales relative to coal marketing requirements. (Suggestions/asistance <br />will be appreciated.) <br /> <br />6.0 SUBTEAM: ENVIRONMENT/CORRIDOR/FEDERAL PERMITTING/ <br />ENERGY MANAGEMENT (Fite) <br />6.1 JULY EVENTS <br /> <br />BlM submitted the draft corridor study report for review <br />and comment. <br /> <br />Draft of Reclamation/Forest Service Memorandum of Understanding <br />was completed and submitted to the Forest Service for review <br />and comment. <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.