Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />ru <br />o <br />C}1 <br />::"'11 <br /> <br />Pretreatment plant <br />Desalting plant. . <br />Appurtenant works. <br />Intake pumping plant system <br />Product waterline <br />Land and site preparation <br />Power transmission facilities <br />Permanent operating facilities <br /> <br />$16,150,000 <br />37,086,000 <br />8,844,000 <br /> <br />The installation cost of other associated facilities outside the <br />plant boundary is $35,970,000. This includes: <br /> <br />Bypass drain . . . . . . . . . . . . . . . <br />Main Outlet Drain Extension Siphon . . . . <br />Irrigation efficiency improvement program. <br />Acreage reduction and/or onfarm <br />irrigation improvements. . <br />Gila River control measures <br />below Painted Rock Dam . . <br /> <br />$15,370,000 <br />3,100,000 <br />2,000,000 <br /> <br />10,500,000 <br /> <br />5,000,000 <br /> <br />Annual operating costs (operation, maintenance, replacement, <br />power) for the Desalting Complex are estimated to be $9,851,000. <br />includes $9,538,000 for the desalting plant facilities within the <br />plant boundary and $313,000 for other associated facilities. <br /> <br />and <br />This <br /> <br />The cost of lining a new 49-mile reach of the Coachella Canal is <br />estimated at $21,450,000. <br /> <br />Tabulations summarizing Federal costs and the unit costs of <br />selected accomplishments for the Project are shown on the following <br />pages. A PF-2 Control Schedule for the Project is shown on Table 1. <br /> <br />18 <br />