Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />N <br />o <br />C)1 <br />C) <br /> <br />COLORADO RIVER INTERNATIONAL SALINITY CONTROL PROJECT <br />SUMMARY OF FEDERAL COSTS <br />(50 yrs. @ 5-5/8% Interest) <br /> <br />Costs <br />($1,000) <br /> <br />Capital Costs !! <br /> <br />Desalting complex <br />Installation cost <br />Interest during construction <br /> <br />98,050 <br />13,095 <br /> <br />111,145 <br />6,685 <br /> <br />Subtotal capital cost <br />Annual equivalent capital cost <br /> <br />Coachella Canal lining <br />Installation cost <br />Interest during construction <br /> <br />21.450 <br />1,160 <br /> <br />Subtotal capital cost <br />Annual equivalent capital cost <br /> <br />22,610 <br />1,360 <br /> <br />Total installation costs <br />Total interest during construction <br />Total capital costs <br /> <br />119,500 <br />14,255 <br />133.755 <br /> <br />Annual equivalent capital costs <br />Operating Costs (Annual) Y <br /> <br />8,045 <br /> <br />Desalting complex <br />Coache11a Canal lining (non-Federal) <br /> <br />9.851 <br />o <br /> <br />Total annual operating costs <br /> <br />9,851 <br /> <br />Tbtal Project Annual Equivalent Costs <br /> <br />Desalting complex <br />Coachella Canal lining <br /> <br />17.896 <br /> <br />16,536 <br />1,360 <br /> <br />1/ Installation (or construction) costs plus interest during construction. <br />Y Operation, maintenance, replacement and power costs. <br /> <br />19 <br />