My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09826
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09826
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:56:03 PM
Creation date
10/12/2006 3:58:02 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8443.600
Description
Narrows Unit - Studies
State
CO
Basin
South Platte
Water Division
1
Date
11/1/1981
Title
Evaluation Missouri Basin Program
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />[[)oom~Tf. <br /> <br />July 1975 <br />OPR addendum <br /> <br />($1,000) <br />January 1981 <br />As authorized Without flood control <br /> <br />Narrows Dam and Reservoir <br /> <br />$126,745 <br />4,175 <br /> <br />$278,529 $241,029 <br />8,957 8,957 <br />2,598 2,598 <br />10,090 10,090 <br />$300, 17 4.!./ $262,674 <br /> <br />Recreation development <br /> <br />Fish and wildlife <br />Enhancement <br />Mitigation <br /> <br />Total project cost <br /> <br />1,585 <br />6,520 <br /> <br />$139,025 <br /> <br />Jj The total project cost of $300,174,000 exceeds the adjusted project <br />cost ceiling by $39.3 million which is less than the project <br />contingencies. <br /> <br />Other Considerations <br /> <br />Potential Hydroelectric Powerplant <br /> <br />A 2.3 megawatt hydroelectric power facility was estimated to utilize <br />river releases averaging 750 ft3/s in June, July, and August, and <br />150 ft3/s during the remainder of the year. <br /> <br />The cost estimate for the potential powerpl ant was based on apprai sal <br /> <br />level cost curves developed by Tudor Engineering Company, Denver, <br />Colorado, under contract wi th the Bureau of Recl amation. The cost for <br />modifyi ng the river outl et works was added, and the powerpl ant costs <br />were indexed to January 1981 price levels. The cost of constructing a <br />2.3-megawatt powerpl ant at Narrows Dam woul d be approximately <br />$6.9 million including indirect costs and interest during construction. <br /> <br />Fish and Wildlife and Recreation <br /> <br />The fi sh and wil dl ife recreati on purposes were not modifi ed for thi s <br /> <br />evaluation. <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.