<br />, <br />!CC <br />c. <br />"l:l" <br />C'": <br /> <br />V~. <br /> <br />o <br /> <br />California Sluice Gate No, 5 W.1B rehabilitated during the year. A <br />bulkhead was installed in the gate opening, and the gate was <br />sandblasted and repainted with VR6 vinyl resin. Rubber seals for the <br />gate were replaced. <br /> <br />Installation of electrical sensing devices and remote terminal units <br />for computer control of the sluice gates Was completed. To date, <br />software problems have prevented proper operation of the sluice gates <br />by computer. <br /> <br />4. Overflow Weir Section <br /> <br />Normal operations at Imperial Dam, when the lake is <br />operating level, is to route surplus water through the <br />Sluiceway gates instead of over the weir. In the event <br />flood, conditions may be such that a major part of the <br />would have to be passed over the weir. <br /> <br />at normal <br />California <br />of a large <br />floodwater <br /> <br />Brush and weeds growing below the overflow weir were sprayed by <br />maintenance crews in late 1981. A security survey recommended <br />improving the intrusion alarm system for the weir area, and this is to <br />be completed in 1982. <br /> <br />Once each month, an inspection was made of the compartments of the <br />overflow weir. Occasional minor leaks were noted in several flexible <br />joints of the weir crest during the winter months. At present, the <br />weir appears to be in good condition. <br /> <br />5. Gila Headworks <br /> <br />The Gila Headgates are operated in full open position for normal <br />operations and the flow to the Gila Gravity Main Canal is regulated by <br />the diversion gates at the downstream end of the Gila Desilting Basin. <br />Occasionally when a pin shears or a hoisting nut is stripped on a <br />diversion gate, the gate falls to full open position; it may then be <br />necessary to regulate the diversion to the Gila Gravity Main Canal by <br />use of the headgates. The Gila Headgates are operated through their <br />full operating cycle once each month as a check to make sure that the <br />gates and equipment are in operating condition at all times. <br /> <br />Normal maintenance practices such as checking and servicing the <br />hoisting equipment, draining and refilling gear cases, servicing the <br />transformers, cleaning the transformer vault, and other routine work <br />were performed during the year. <br /> <br />6. Gila Desilting Basin <br /> <br />The Gila Desilting Basin was in continuous operation during the year <br />except during the period November 25 to December 3 when the Gila <br />Gravity Main Canal was taken out of service for yearly maintenance. <br />The basin was drained and the sediment deposited in the basin waB <br />sluiced to the river on November 25. The avprage depth of sediment in <br /> <br />12 <br />