My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09629
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09629
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:54:52 PM
Creation date
10/12/2006 3:45:42 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.500.10
Description
Glenwood-Dotsero Springs Unit - Salinity Control Projects- Aquatrain
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
5/1/1983
Title
Monthly Progress Report - Aquatrain Project - May 1983
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />l~ <br />:') <br /> <br />(~ <br /> <br />~ 5.5 SUMMARY OF CONTRACTING ACTIVITIES <br />C,; <br />~.) 6.0 SUBTEAM: ENVIRONMENT, CORRIDOR, FEDERAL PERMITTING, AND <br />ENERGY MANAGEMENT <br /> <br />6.1 MAY EVENTS <br /> <br />Inhouse <br /> <br />Project description completed for use by BLM corridor study <br />team. <br /> <br />Requested Utah Projects Office study alternatives to Price- <br />San Rafael salinity control unit and analyze water rights <br />issues for use of saline water at IPP in exchange for fresh. <br /> <br />Work begun on preparation of Stage I and II proposal to <br />be submitted to Los Angeles Department of Water and Power. <br /> <br />First draft prepared on Memorandum of Understanding with <br />Forest Service to define working arrangement during corridor <br />study and EIS preparation. <br /> <br />BLM <br /> <br />Presentation made on results of Phase I corridor study. <br />Corridors not serving project needs eliminated from consideration <br />and reasons documented. <br /> <br />Preparation of corridor screening criteria begun (task 4). <br /> <br />Corridor study management plan submitted by BLM and approved <br />by Reclamation. <br /> <br />6.2 ANTICIPATED JUNE EVENTS <br /> <br />Statement of work for energy demand study task force to <br />be completed by Western. <br /> <br />Briefing by BLM, Division of EIS Services, on Phase II results <br />of corridor study to be held June 24. <br /> <br />Send Forest Service/Reclamation Memorandum of Understanding <br />for formal review and comment. <br /> <br />Complete Stage I and II project proposal to Los Angeles <br />Department of Water and Power. <br /> <br />6.3 ANTICIPATED JULY EVENTS <br /> <br />Prepare Working Agreement No. 2 to Grace/Reclamation Cooperative <br />Agreement to define work to be undertaken in EIS preparation <br />and planning for Stage I of project. <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.