My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09629
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09629
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:54:52 PM
Creation date
10/12/2006 3:45:42 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.500.10
Description
Glenwood-Dotsero Springs Unit - Salinity Control Projects- Aquatrain
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
5/1/1983
Title
Monthly Progress Report - Aquatrain Project - May 1983
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />~- <br /> <br />. ) <br /> <br />c."'-; <br />""'~ <br />r.." ~ <br />(.. ) <br /> <br />Fine Pigments, Inc.'s data on fine grinding of coal in a fluid <br />energy mill indicates selective elimination of ash and reduction <br />in moisture, resulting in higher BTU product. <br /> <br />Subteam leader inspected damaged binary cooling tower (Tower <br />Systems, Florida) and found the system is repairable, but <br />the longevity of mylar (the heat exchange surface) is questionable. <br /> <br />COAlIQUID, Inc. has offered to test COloWyo coal for coal- <br />oil-water mix at no charge. <br /> <br />Subteam leader is collecting data and has prepared a draft <br />on location of coal, CO2, trona, and nahcolite resources <br />in Wyomiong, Colorado, and Utah to help determine corridor <br />rou te . <br /> <br />Hazelton & Wilfley Pump Companies are interested in work <br />on pumping requirements. <br /> <br />5.2 ANTICIPATED JUNE EVENTS <br /> <br />ESU, Inc. will submit a proposal in early June to aid project's <br />cost effectiveness, estimating and scheduling, and quality <br />assurance, and to project risk assessment. <br /> <br />King-Wilkinson Engineering Company, Houston, Texas, will <br />make a presentation in early June on possible adaptation <br />of their cooling tower system which normally uses once-through <br />saline water, to a recycle/concentration process (binary <br />cooling tower). <br /> <br />Complete PROPlAN of Technical Engineering Subteam section. <br /> <br />Complete mapping of location of raw materials in Wyoming, <br />Colorado, and Utah. <br /> <br />Start detailed engineering studies, equipment specifications, <br />and cost estimate of prototype pipeline (14-mile loop) route. <br /> <br />Determine possible effectiveness of simultaneous beneficiation <br />and fluid energy mill coal grinding. <br /> <br />5.3 ANTICIPATED JULY EVENTS <br /> <br />Continue detailing prototype pipeline route. <br /> <br />Continue beneficiation studies if results favorable. <br /> <br />5.4 CURRENT PROBLEMS <br /> <br />Inadequate interface with environmental aspects of project <br />planning. <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.