Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />~- <br /> <br />. ) <br /> <br />c."'-; <br />""'~ <br />r.." ~ <br />(.. ) <br /> <br />Fine Pigments, Inc.'s data on fine grinding of coal in a fluid <br />energy mill indicates selective elimination of ash and reduction <br />in moisture, resulting in higher BTU product. <br /> <br />Subteam leader inspected damaged binary cooling tower (Tower <br />Systems, Florida) and found the system is repairable, but <br />the longevity of mylar (the heat exchange surface) is questionable. <br /> <br />COAlIQUID, Inc. has offered to test COloWyo coal for coal- <br />oil-water mix at no charge. <br /> <br />Subteam leader is collecting data and has prepared a draft <br />on location of coal, CO2, trona, and nahcolite resources <br />in Wyomiong, Colorado, and Utah to help determine corridor <br />rou te . <br /> <br />Hazelton & Wilfley Pump Companies are interested in work <br />on pumping requirements. <br /> <br />5.2 ANTICIPATED JUNE EVENTS <br /> <br />ESU, Inc. will submit a proposal in early June to aid project's <br />cost effectiveness, estimating and scheduling, and quality <br />assurance, and to project risk assessment. <br /> <br />King-Wilkinson Engineering Company, Houston, Texas, will <br />make a presentation in early June on possible adaptation <br />of their cooling tower system which normally uses once-through <br />saline water, to a recycle/concentration process (binary <br />cooling tower). <br /> <br />Complete PROPlAN of Technical Engineering Subteam section. <br /> <br />Complete mapping of location of raw materials in Wyoming, <br />Colorado, and Utah. <br /> <br />Start detailed engineering studies, equipment specifications, <br />and cost estimate of prototype pipeline (14-mile loop) route. <br /> <br />Determine possible effectiveness of simultaneous beneficiation <br />and fluid energy mill coal grinding. <br /> <br />5.3 ANTICIPATED JULY EVENTS <br /> <br />Continue detailing prototype pipeline route. <br /> <br />Continue beneficiation studies if results favorable. <br /> <br />5.4 CURRENT PROBLEMS <br /> <br />Inadequate interface with environmental aspects of project <br />planning. <br /> <br />3 <br />