Laserfiche WebLink
<br />(V) <br />>) <br /> <br />. <br /> <br />. <br /> <br />.~...-, <br />, .. <br /> <br />~ <br /> <br />May 20, speech to Colorado Mining Association, Grand Junction. <br /> <br />May 24-26, briefings of Washington Office Interior staffs <br />and meetings with Departments of State and Commerce and <br />President's trade representative. <br /> <br />May 27, meeting with Emery County Commissioners, Utah. <br /> <br />(.. '1 <br />(.) <br /> <br />3.2 ANTICIPATED JUNE EVENTS <br /> <br />June 1-2, meeting of Energy Impact Advisory Committee. <br /> <br />3.3 ANTICIPATED JULY EVENTS <br />3.4 CURRENT PROBLEMS <br />3.5 SUMMARY OF CDNTRACTING ACTIVITIES <br />4.D SUBTEAM: FINANCIAL/ECONOMIC <br />4.1 MAY EVENTS <br /> <br />Pipeline Financing Seminar in Silverado, California, May 2-4. <br />Consensus was that AQUATRAIN should use uniqueness of technology <br />as basis for tailoring the financial and regulatory climate <br />rather than relying on precedents from the oil and gas industry. <br /> <br />Meeting in Montgomery, Alabama, May 6, with Blount Construction <br />to explore potential equity participation. <br /> <br />May 9, meeting with Morrison-Knudsen, Boise, to discuss design <br />services. <br /> <br />4.2 ANTICIPATED JUNE EVENTS <br />4.3 ANTICIPATED JULY EVENTS <br />4.4 CURRENT PROBLEMS <br />4.5 SUMMARY OF CDNTRACTING ACTIVITIES <br />5.0 SUBTEAM: TECHNICAL/ENGINEERING <br />5.1 MAY EVENTS <br /> <br />International Engineering Company, a division of Morrison-Knudson, <br />has provided order-of-magnitude cost estimates for construction <br />of the 14-mile demonstration loop (from Hunter Powerplant, west <br />seven miles, and back to Hunter) and, the 100-150 mile commercial <br />pipeline (from Castle Dale to IPP). All demonstration loop equipment <br />would be commerical size. <br /> <br />2 <br />