My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09629
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09629
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:54:52 PM
Creation date
10/12/2006 3:45:42 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.500.10
Description
Glenwood-Dotsero Springs Unit - Salinity Control Projects- Aquatrain
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
5/1/1983
Title
Monthly Progress Report - Aquatrain Project - May 1983
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />c, <br />~. :> <br /> <br />. <br /> <br />. <br /> <br />:. ....;; <br /> <br />.....~ <br /> <br />( .~ <br /> <br />Prepare Work Order No. 2 to Reclamation/BLM Interagency <br />Agreement to define work and funds available for preparation <br />of EIS by EIS Services. <br /> <br />Prepare EIS scoping plan. <br /> <br />(. <br /> <br />6.4 CURRENT PROBLEMS <br /> <br />Funding for preparation of the EIS needs to be resolved <br />by June so we can inform BLM and Fish and Wildlife Service <br />of workload we will be requesting from them through FY85. <br /> <br />6.5 SUMMARY OF CONTRACTING ACTIVITIES <br />7.0 PLANNING COORDINATION, REPORTS, PUBLIC INVOLVEMENT <br />7.1 MAY EVENTS <br /> <br />Completed "first cut" at Project Master Schedule, Activity <br />Start Sequence listing. Critical that subteam leaders review <br />and provide comments, including start and duration information. <br /> <br />Initial Colorado advance work accomplished: <br /> <br />- Moffat County - support for primary route and opposition <br />to secondary. Interested in expanding export of coal <br />with sensitivity to ranching. <br />- Garfield County - supportive, positive feedback. Issues <br />involve socioeconomic benefits with sensitivity to split <br />in county between environmental and economic orientations. <br />- Mesa County - supportive but cautious due to recent shutdowns <br />in oil shale industry. Sensitivities include land use, <br />agriculture, and ranching. <br />- Rio Blanco - supportive for economic reasons and sensitivity <br />is oriented toward socioeconomic issues. Will work closely <br />with county on corridor routing. <br /> <br />Conducted various coordination activities in Washington, D.C., <br />following Clinton/McKeever briefing on May 25. <br /> <br />Public information activities in progress include: slide <br />show, exhibits, brochure, speech writing, and placement <br />of articles in print media. <br /> <br />Located what appears to be suitable program for mailing list. <br /> <br />7.2 ANTICIPATED JUNE EVENTS <br /> <br />Anticipate selection of four student analysts for public <br />involvement effort. Analysts to report to Planning Coordinator <br />with Denver as duty station. UC to provide support in personnel <br />process and training of incumbents. <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.