My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09608
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09608
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:54:45 PM
Creation date
10/12/2006 3:45:13 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.112.A
Description
Dallas Creek Participating Project
State
CO
Basin
Gunnison
Water Division
4
Date
3/1/1965
Author
Tri-County WCD
Title
Application to National Rivers and Harbors Congress/Projects Committee - for Examination and Classification of Project
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />j <br /> <br />EXHIBIT'D' <br /> <br />I' _ ,'~,,;A<,,; .:~/':_./" ;' <br /> <br />CHAPTER II <br /> <br />PLAN OF DEVELOPMENT <br /> <br />Creek that would be conveyed to the reservoir by the Dallas Creek Feeder <br /> <br />Canal. Some of the water from the reservoir would be released to the <br /> <br />Pleasant Valley stream channel and the remainder would be diverted at <br /> <br />the reservoir outlet into the Log Hill Mesa Canal. The releases made <br /> <br />to the stream would be diverted about 3 1/2 miles below the dam into <br /> <br />the potential ,Pleasant Valley Canal and conveyed eastward to lands <br /> <br />along Dallas and Plea;ant Valley Creeks above Ridgway Reservoir., Water <br /> <br />diverted into the Log Hill Mesa Canal would be conveyed northeast to <br /> <br />serve lands on the mesa above the McKenzie Canal. <br /> <br />Sneva Reservoir <br /> <br />The potential Sneva Reservoir at a site offstream from Cow Creek <br /> <br />would be provided water by the existing Sneva Ditch diverting from Cow <br /> <br />Creek. The ditch which presently crosses the reservoir basin would be <br /> <br />realigned. Releases from the Reservoir would be made to the potential <br /> <br />Sneva Outlet Canal and conveyed westward to lands in the valley along <br /> <br />Dry Creek. <br /> <br />Laterals and drains <br /> <br />On all project lands except on Log Hill Mesa existing laterals and <br /> <br />ditches are expected to be adequate for delivery of project 'water with <br /> <br />minor improvements that could be made by the water users. A new laterll,l <br /> <br />system would be requir ed for approximately 11,800 acres on Log Hill Mesa. <br /> <br />This ~ld consist of project-cOnstructed laterals and natural channels <br /> <br />of McKenzie Creek, Fisher Creek, and other intermittent suealDs that <br /> <br />would be used for conveyance of project water. <br />
The URL can be used to link to this page
Your browser does not support the video tag.