Laserfiche WebLink
<br /> <br />II <br />I <br /> 0 <br />I N <br />. ..J <br />Q <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />'1 <br />I <br />I <br />I <br />I <br />I <br /> <br />Table 2 U dated Conce <br /> <br />tual Cost Estimate for Webster Hill Dam and Reservoir <br />1976 Dwyer - 2001 Estimate of <br />Sheperd Dam Other Required <br />Estimate Com >onents <br />$ 8,480,000 <br /> <br />Feature <br />Webster Hill Dam and Reservoir <br />10 MW Hydropower Component <br />Railroad Relocation <br />Interstate 70 Vertical Re-alignment <br />Gas Well Re-Iocation <br />Real Estate Acquisition (1250 acres) <br />Subtotal <br />Engineering and Permitting - 30% <br />Contingency - 30% <br />Total <br /> <br />Notes: <br /> <br />$13,000,000 <br />$ 2,260,000 <br />$ 4,850,000 <br />. $ 2,000,000 <br />$ 9,375,000 <br /> <br />~..e.-I'.<4 <br /> <br />2001 Cost <br />$ 16,249,000 <br />$ 13,000,000 <br />$ 2,260,000 <br />$4,850,000 <br />$ 2,000,000 <br />$ 9,375,000 <br />$ 47,734,000 <br />$ 14,320,000 <br />$ 14,320,000 <br />$ 76,374,000 <br /> <br />1) 3.0% = annual price index to adjust 1980 costs to 2001 <br /> <br />2) The 1976 Dwyer - Sheperd cost does not include the cost of land acquisition, rights of way, reservoir <br />basin clearing, relocations or modifications to transportation, relocation or modifications to gas wells <br />or other facilities within the reservoir basin, nor does it include a hydropower component. <br /> <br />3) Reservoir Data: <br />WSL: 5,250 <br />AF: 28,909 <br />Dam Height 68 ft. above stream bed. <br /> <br />4) 1976 Costs from Rifle Ski COrDoration. Webster Hill Reservoir. Preliminarv Enoineerino Evaluation, <br />February 1976, Dwyer-Sheperd Engineers. Cost used above is for a concrete gravity dam, a <br />maximum WSL of 5,250 and a reservoir capacity of 28,909 AF. <br /> <br />5) 2001 Costs for components not included in Dwyer-Sheperd estimate are conceptual estimates. <br />These estimates should be refined based on pre-feasibility level design. <br /> <br />6) Acquisition and installation of the turbines is estimated to cost $1300/kw (personal communication <br />from James Street, CRS Sirrine, Inc. to Jim Warford, Brown and Caldwell, Walnut Creek,CA, June 13, <br />2001. Therefore: $1300/kw x 10mw x 1000kw/mw = $13 million. <br /> <br />n:\data\aen\cwcb\l 9665\a1lernative 4\techmem04\webster hill tables 1-3.doc <br />