My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09467
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09467
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:53:50 PM
Creation date
10/12/2006 3:39:08 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8281.990
Description
Colorado River Studies and Investigations -- Webster Hill Dam and Reservoir
Basin
Colorado Mainstem
Water Division
5
Date
6/1/2001
Author
Brown and Caldwell
Title
Technical Memo NO 4A: Analysis of Alternative 4 - New Storage Facility at Webster Hill Site - Mainstem Colorado River
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />II <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Table 1 <br />Estimated Water Availability to a Junior Water Right Diverting from the Colorado River <br />at the Webster Hill Reservoir Site <br /> <br />'-::> <br />. .') <br />N <br />('~) <br />0':) <br />~ <br /> <br />Date <br />Avera e <br /> <br />Water Available <br />(AF) <br />160,446 <br /> <br />20,000 AF <br />Release <br />Required? <br /> <br />Is it possible to <br />Refill in July & <br />August? <br /> <br />Greater than <br />200 cfs?\ <br /> <br />Maximum <br /> <br />1,417,806 <br /> <br />Minimum 12 <br /> <br />Notes: <br />1, Source of data is: HydroBase, Division 5 Streamflow Records, Data in this table <br />were estimated by: <br /> <br />a, Flow at the Webster Hill site was estimated as: Flow at the De Beque gage <br />- Parachute Creek flow, <br /> <br />b. During the irrigation season, available flow for diversion under a junior right <br />at the Webster Hill site was estimated by: Estimated flow at the <br />Webster Hill site - 2000 cfs (the Cameo call), <br /> <br />c, During the non-irrigation season, available flow for diversion under a junior right <br />at the Webster Hill site was estimated by: Estimated flow at the Webster <br />Hill site - 800 cfs ( the Grand Valley Power Project call) <br /> <br />o:ldatalQenlcwcbl 19665\altemalive4\techmem04\techmem04altabJes techmem04,xls <br /> <br />Page 9 <br /> <br />J <br />
The URL can be used to link to this page
Your browser does not support the video tag.