My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09394
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09394
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:53:20 PM
Creation date
10/12/2006 3:36:29 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.106
Description
Animas-La Plata
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
9/1/1997
Title
Animas-La Plata Project Summary Information
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'. <br /> <br />. <br /> <br />. <br /> <br />Animas-La Plata Project <br />Feature Fact Sheet <br /> <br />Phase II (Total Project) <br />(continued) <br /> <br />Pipelines, Canals, and Laterals <br /> <br />Ridges Basin Inlet Conduit <br />Durango M&I Pipeline <br />Shenandoah M&I Pipeline <br />La Plata Rural M&I Pipeline <br />Dry Side Canal (majority earth-lined, 0,9 mile <br />concrete-lined section) <br />Long Hollow Tunnel (IO,5-feet-dia, concrete lined) <br />Southern Ute Inlet Canal (concrete-lined) <br />Southern Ute Interim Irrigation Canal (earth-lined) <br />New Mexico Irrigation Canal (earth-lined) <br />Laterals <br /> <br />Recreation Areas <br /> <br />Length <br />(miles) <br /> <br />Capacity <br />(efs) <br /> <br />Constructed in Phase I, Stage A <br />Constructed in Phase I, Stage A <br />Constructed in Phase I, Stage A <br />Would not be constructed <br />27,57 700 to 230 <br /> <br />Constructed in Phase I, Stage B <br />3.3' 375 <br />Abandoned in Phase II <br />3,1 <br />190,79 <br /> <br />140 <br />Various <br /> <br />Ridges Basin Recreation Area -- Would be constructed in Phase I, Stage A <br /> <br />Southern Ute Reservoir Recreation Area <br />People at one time 950 <br />Annual recreation days 181,000 <br />Facilities: Hiking trails, camping units, picnic units, boat ramp and slips, parking area, <br />entrance station, beach, fish cleaning station, administrative building, <br /> <br />7 The last 1.9 miles of Dry Side Canal would be constructed in Phase II, <br /> <br />, The last 0,7 mile of Southern Ute Inlet Canal would be constructed in Phase II. <br /> <br />9 Approximately 81 ,I miles of irrigation laterals would be constructed in Phase II. <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.