<br />.
<br />
<br />e
<br />
<br />Waler supply and area served (ProPOSed Plan)
<br />
<br />.
<br />
<br /> Phase I, Stage A Phase I, Stage B Phase II
<br /> Colorado New Mexico BoIh BoIh Colorado New Mexico Both Balh Colorado New Mexico BoIh Both
<br /> Project waler use/allottee Avg Avg Avg Avg Avg Avg Avg Avg Avg
<br /> annual annual annual annual annual annual annual annual annual
<br /> watOf Land water Land water land water land water Land water Land walOf Land water Land water Land
<br /> suP!ll'l area supply area supply area supply area supply area supply area supply area supply area supply area
<br /> (acre- served (acre- served (aere- served (acre- served (acre- served (acre- served (acre- served (acre- served (acre- served
<br /> feet) (acres) feet) (acres) feel) (acres) feel) (acres) feet) (acres) feel) (acres) feel) (acres) feet) (acres) feet) (acres)
<br />Irrigation Full Indian Southern Ute 3,130 1,413 3,1X 1,413 3.130 1.BOO 3.130 ',BOO
<br /> service
<br /> Ute Mountain
<br /> Ute 25.430 , 0 25,430 25,430 11,600 830 3BO 26,260 11,980
<br /> Subtotal
<br /> Indian 26,560 1,413 0 0 28.560 1,413 28,560 13,400 830 3BO 29,390 13.780
<br /> Non-Indian 36.730 21,208 3,525 1,370 40,255 22,578 54,430 31,523 7.660 3,010 62,090 34,533
<br /> Tolal full selVice 65,290 22,621 3,525 1,370 68,815 23,991 82,990 44,923 8,490 3,390 91,480 48,313
<br /> Supplemental SelVice (Non-Indian) 16,480 13,978 4,315 3,850 20,795 17,628 15,500 13,978 4,150 3,650 19,650 17,588
<br /> Total irrigation 81,770 36,599 7,840 5,020 89,610 41,619 98,490 58,861 12,640 7,040 111,130 65,901
<br />Municipal [)urango, ColOrado 7.200 7,200 7,200 7,200 7,200 7,200
<br />and
<br />industrial Rural users-la Plata Colorado 2.000 2.000 2.000 2,000 2,000 2,000
<br /> Southern ute Indian Tribe 26,500 26,500 26,500 26,500 26,500 26,500
<br /> Ute Mounlain Ute Tribe 8,000 , ..000 6,000 8,000 8,000 6,000
<br /> Aztec, New Mexico area 5,200 5,200 5,200 5,200 5,200 5,200
<br /> Farmington, New Mexico area 18,900 18,900 18,900 18,900 18,900 18,900
<br /> Bloomfield, New Mexico area 6,700 6,700 6,700 6,700 6,700 6,700
<br /> Navajo Tribal Utility Authority 7.BOO 7.BOO 7,600 7,600 7,BOO 7,800
<br /> Total M&I 41,700 38,400 80,100 41,700 38,400 80,100 41,700 38,400 00,100
<br /> Project total 41.700 0 38,400 0 80,100 0 123,470 36,599 46,240 5,020 169,71 41,619 140,190 58,861 51,040 7,040 191,230 65,901
<br /> 0
<br />
<br />V>
<br />
<br />1. .. . el'Wir under Phase I, Stage A.
<br />Available In Ridges Basin Res
<br />22,490 acre-feel delivered to 1,413 acres, the remaining 640 acre-feet available in Ridges Basin Reservoir under Phase I, Slage B.
<br />3 Available in Ridges BaSIn Reservoir under Phase I, Slage B.
<br />
|