My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09394
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09394
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:53:20 PM
Creation date
10/12/2006 3:36:29 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.106
Description
Animas-La Plata
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
9/1/1997
Title
Animas-La Plata Project Summary Information
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />i. <br /> <br />Animas-La Plata Project <br />Feature Fact Sheet <br /> <br />Phase II (Total Project) <br /> <br />Reservoirs and Dams <br /> <br />Ridges Basin Dam & Reservoir -- Constructed in Phase I, Stage A <br /> <br />Southern Ute Dam <br />Height above streambed (feet) <br />Crest Length (feet) <br /> <br />170 <br />2,900 <br /> <br />Southern Ute Reservoir <br />Capacity <br />Active Capacity (acre-feet) <br />Inactive and Dead Capacity (acre-feet) <br />Total Capacity (acre-feet) <br /> <br />40,000 <br />30 000 <br />70,000 <br /> <br />Surface Area (at top of active - elev, 6,076 feet) (in acres) <br /> <br />1,386 <br /> <br />Southern Ute Diversion Dam -- Constructed in Phase I, Stage B <br />La Plata Diversion Dam <br />Type Concrete overflow spillway flanked by two compacted earth <br />dikes <br />Length (feet) 50 <br /> <br />Pumping Plants <br /> <br />Maximum <br />lift (feet) <br /> <br />Capacity <br />( cfs) <br /> <br />Durango Pumping Plant <br />Ridges Basin Pumping PlantS <br />Red Mesa Pumping Plant <br />Alkali Gulch Pumping Plant <br />Ute Mountain Pumping Plant <br />Southern Ute Pumping Plant <br />Third Terrace Pumping Plant <br /> <br />Constructed in Phase I, Stage A <br />9306 706 <br />Constructed in Phase I, Stage B <br />139 45 <br />170 56 <br />299 17 <br />140 30 <br /> <br />S The full-size Ridges Basin Pumping Plant would be constructed during Phase !, Stage B. Additional pumps <br />would be installed in Phase II to provide to provide the required total Project capacity, <br /> <br />6 Maximum lift to Dry Side Canal would be 330 feet; maximum lift to Shenandoah M&! Pipeline would be 930 <br />feet. <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.