Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />i. <br /> <br />Animas-La Plata Project <br />Feature Fact Sheet <br /> <br />Phase II (Total Project) <br /> <br />Reservoirs and Dams <br /> <br />Ridges Basin Dam & Reservoir -- Constructed in Phase I, Stage A <br /> <br />Southern Ute Dam <br />Height above streambed (feet) <br />Crest Length (feet) <br /> <br />170 <br />2,900 <br /> <br />Southern Ute Reservoir <br />Capacity <br />Active Capacity (acre-feet) <br />Inactive and Dead Capacity (acre-feet) <br />Total Capacity (acre-feet) <br /> <br />40,000 <br />30 000 <br />70,000 <br /> <br />Surface Area (at top of active - elev, 6,076 feet) (in acres) <br /> <br />1,386 <br /> <br />Southern Ute Diversion Dam -- Constructed in Phase I, Stage B <br />La Plata Diversion Dam <br />Type Concrete overflow spillway flanked by two compacted earth <br />dikes <br />Length (feet) 50 <br /> <br />Pumping Plants <br /> <br />Maximum <br />lift (feet) <br /> <br />Capacity <br />( cfs) <br /> <br />Durango Pumping Plant <br />Ridges Basin Pumping PlantS <br />Red Mesa Pumping Plant <br />Alkali Gulch Pumping Plant <br />Ute Mountain Pumping Plant <br />Southern Ute Pumping Plant <br />Third Terrace Pumping Plant <br /> <br />Constructed in Phase I, Stage A <br />9306 706 <br />Constructed in Phase I, Stage B <br />139 45 <br />170 56 <br />299 17 <br />140 30 <br /> <br />S The full-size Ridges Basin Pumping Plant would be constructed during Phase !, Stage B. Additional pumps <br />would be installed in Phase II to provide to provide the required total Project capacity, <br /> <br />6 Maximum lift to Dry Side Canal would be 330 feet; maximum lift to Shenandoah M&! Pipeline would be 930 <br />feet. <br /> <br />3 <br />