My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09394
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09394
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:53:20 PM
Creation date
10/12/2006 3:36:29 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.106
Description
Animas-La Plata
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
9/1/1997
Title
Animas-La Plata Project Summary Information
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />Animas-La Plata Project <br />Feature Fact Sheet <br /> <br />Phase I, Stage B <br /> <br />Reservoirs and Dams <br /> <br />Ridges Basin Dam & Reservoir -- Constructed in Phase I, Stage A <br />Southern Ute Diversion Dam <br />Type Concrete overflow spillway flanked by two compacted earth <br />dikes <br />Length (feet) 100 <br /> <br />Pumping Plants <br /> <br />Maximum Capacity <br />lift (feet) (cfs) <br />525 480 <br />930' 606 <br />214 77 <br />Length Capacity <br />(miles) (cfs) <br /> <br />Durango Pumping Plant' <br />Ridges Basin Pumping Plant' <br />Red Mesa Pumping Plant <br /> <br />Pipelines, Canals, and Laterals <br /> <br />Ridges Basin Inlet Conduit <br />Durango M&I Pipeline <br />Shenandoah M&I Pipeline <br />La Plata Rural M&I Pipeline <br />Dry Side Canal (majority earth-lined, 0.9 mile <br />concrete-lined section) <br />Long Hollow Tunnel (IO.5-feet-dia, concrete lined) <br />Southern Ute Inlet Canal (concrete-lined) <br />Southern Ute Interim Irrigation Canal (earth-lined) <br />Laterals <br /> <br />Constructed in Phase I, Stage A <br />Constructed in Phase I, Stage A <br />Constructed in Phase I, Stage A <br />Would not be constructed <br />25.6 700 to 370 <br /> <br />3.2 <br />2.6 <br />2,7 <br />109.6 <br /> <br />700 <br />375 <br />100 <br />Various <br /> <br />Recreation Facilities <br />Ridges Basin Recreation Area -- Would be constructed in Phase I, Stage A. <br /> <br />2 Additional pumps would be installed in Durango Pumping Plant during Phase !, Stage B. <br /> <br />3 The full-size Ridges Basin Pumping Plant would be constructed during Phase !, Stage B. Pumps would be <br />installed to provide a Phase!, Stage B capacity of 606 cfs (600 cfs delivered to Dry Side Canal, 6 cfs delivered to <br />Shenandoah M&! Pipeline), <br /> <br />4 Maximum lift to Dry Side Canal would be 330 feet; maximum lift to Shenandoah M&! Pipeline would be 930 <br />feel. <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.