Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />Animas-La Plata Project <br />Feature Fact Sheet <br /> <br />Phase I, Stage B <br /> <br />Reservoirs and Dams <br /> <br />Ridges Basin Dam & Reservoir -- Constructed in Phase I, Stage A <br />Southern Ute Diversion Dam <br />Type Concrete overflow spillway flanked by two compacted earth <br />dikes <br />Length (feet) 100 <br /> <br />Pumping Plants <br /> <br />Maximum Capacity <br />lift (feet) (cfs) <br />525 480 <br />930' 606 <br />214 77 <br />Length Capacity <br />(miles) (cfs) <br /> <br />Durango Pumping Plant' <br />Ridges Basin Pumping Plant' <br />Red Mesa Pumping Plant <br /> <br />Pipelines, Canals, and Laterals <br /> <br />Ridges Basin Inlet Conduit <br />Durango M&I Pipeline <br />Shenandoah M&I Pipeline <br />La Plata Rural M&I Pipeline <br />Dry Side Canal (majority earth-lined, 0.9 mile <br />concrete-lined section) <br />Long Hollow Tunnel (IO.5-feet-dia, concrete lined) <br />Southern Ute Inlet Canal (concrete-lined) <br />Southern Ute Interim Irrigation Canal (earth-lined) <br />Laterals <br /> <br />Constructed in Phase I, Stage A <br />Constructed in Phase I, Stage A <br />Constructed in Phase I, Stage A <br />Would not be constructed <br />25.6 700 to 370 <br /> <br />3.2 <br />2.6 <br />2,7 <br />109.6 <br /> <br />700 <br />375 <br />100 <br />Various <br /> <br />Recreation Facilities <br />Ridges Basin Recreation Area -- Would be constructed in Phase I, Stage A. <br /> <br />2 Additional pumps would be installed in Durango Pumping Plant during Phase !, Stage B. <br /> <br />3 The full-size Ridges Basin Pumping Plant would be constructed during Phase !, Stage B. Pumps would be <br />installed to provide a Phase!, Stage B capacity of 606 cfs (600 cfs delivered to Dry Side Canal, 6 cfs delivered to <br />Shenandoah M&! Pipeline), <br /> <br />4 Maximum lift to Dry Side Canal would be 330 feet; maximum lift to Shenandoah M&! Pipeline would be 930 <br />feel. <br /> <br />2 <br />