My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09333
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09333
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:52:56 PM
Creation date
10/12/2006 3:35:00 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.40
Description
CRSP
Basin
Colorado Mainstem
Date
1/30/1961
Author
USDOI
Title
Forth Annual Report on the Statuts of the Colorado River Storage Project
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />22 <br /> <br /> <br />COLORNDO .roVER ,!>T<lRAGEI' PROJECT <br /> <br />fJeld dllitlli for. evalullitio*of the proposllil of the utility compllinies WlliS <br />essentially completed llit the end of the fiscal Yellir. . <br />As lli result of 8evera~ meetings llind discussions between the Burelliu <br />llind interested parties, ithere was generllillligreement that the Bureau <br />sho\lld construct the transmission liues from Flllimiug Gorge to Ollik <br />Creek, Colo., llind from Glen Cllinyon to the Curecllinti llirea. Accord- <br />ingly, llierial reconUlliissllince WlliS completed llind field surveys initillited <br />on the proposed Fllliming Gorge-Vernal tmnsmission line and recon- <br />naissllillCe. surveys were initiated on the proposed Glen Cllinyon-Four <br />Corners llind Vernal-Oak Oreek lines. <br /> <br />PAONIA P~RTICIPATING PROJEOT, COLORADO <br /> <br />Work on the prime) contrllict for construction 'of Pllionilli Dllim and <br />relocation of OolomdoJStllite Highway 133 was progressing niccly, with <br />63 percent completiorl in 54 percent of the time allowed by the con- <br />trllict. Muddy: Oreek was diverted through the outlet-works tunnel <br />ofthe dam in MlliY 19ffO. <br />A portion of the Fire Mountain Canllil was operatively completed in <br />MlliY 1960 and construction of earth lining for various sections of the <br />canal WlliS continuing: at the close of the fiscal year. . <br />A contract was lliwarded in June 19ffO for clelliring 300 llicres of the <br />reservoir site and relpcllition of lli county rOllid within the site. <br /> <br />, I <br />CENTRAL UTAH PAETICIPATING PROJECT, VERNAL UNIT) UTAH <br /> <br />At June 30, 19ffOf work on the prime contrlliCt for construction <br />of the earthfill Stllinlfker Dllim WlliS slightly behind schedule, with 58 <br />percent completion in ff8 percent of the elapsed contmct time. Oon- <br />crete placement in the dllim structures WlliS essentillilly complete. <br />Late in June 19ffO,jcontrlliCt lliward WlliS mllide for ellirthwork, concrete <br />lining, and structures for the Fort Thornburgh diversion dllim, Stllinlliker> <br />feeder canllil, llind the Rock Point Canal extension. ' <br />! <br /> <br />HAMMOND) PARTIOIPATING PROJECT, NEW MEXICO <br />, <br />Initial construction funds were llipproprillited for the Hammond <br />pllirticiplliting proje6t in fiscal year 19ffO. Activity during the year <br />was limited to tile prepllirllition llind llipproVlliI of design datlli and the <br />lliwllird of a contrllict for the construction of earthwork llind structures <br />for the mlliin canal. <br /> <br />SMITH FORK PARTIQIl'ATING PROJECT, COLORADO <br /> <br />, Funds were lliPpfopriated for initiating construction of the Smith <br />Fork particiPllitingj' project during fisMl year 19ffO. Activity during <br />the fiscal year WlliS imited to the preparation of design dllita for project <br />. fellitures. A eontr~ct for construction of Crawford Dllim WlliS lliwllirded <br />to the. Bud King Oonstruction 00. in Septemher 19ffO in the amount <br />of $1,930,000. <br /> <br />SEEDSKA.DEE PAR.TICIPATING PROJECT, WYOMING <br /> <br />Further studies: llind investigllitions llire required on tbe Seedskllidee <br />pllirticipating proi~ct due to the discovery of large tronlli deposits under <br />certlliin llireas of the project lands. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.