<br /> <br />COLORADO RIVER STORAGE PROJECT <br /> <br />23 <br /> <br /> <br />ADVANCE PLANNING ACTIVITIES <br /> <br />The supplemental report and economic justification for the Blue <br />Mesa and Morrow Point Dams and powerplants of the Ourecanti <br />storage unit were ~ubmitted to the Oongress on July 14, 1959. Funds <br />for 'construction of the Blue Mesa features of the Ourecanti unit are <br />contained in the fiscal year 1961 appropriations. Investigations of <br />the potential Orystal Dam and powerplant of the same unit continued. <br />The definite plan report on the Florida participating project in <br />Oolorado was completed and funds appropriated for initiating con- <br />stl'Uction in fiscal year 1961. <br />Advance planning studies for preparation of definite plan reports <br />continued during the fiscal year on other authorized participating <br />projects. <br />Special recognition is hereby gi ven to the several States of the upper <br />and lower basins for their assistance and material participation in <br />expediting the investigation and construction of the project. In <br />addition to financial participation by various States, both for pre- <br />construction investigation costs and aid in financing incremental <br />construction costs, many of the States have facilitated the construc- <br />tion program by the prompt building of access roads and highways <br />leading to the remote units of the project. These roads involved the <br />use of State funds as well as matching Federal appropriations in cer- <br />tain cases. The cost of these roads is not reflected in the records of <br />the project inasmuch as they are not part ot the authorized features. <br /> <br />3. ALLOCATION OF FEDERAL INVESTMENT <br /> <br />Section 6 of the authorizing act states that upon completion of each <br />unit, participating project, or sep'll'able feature thereof, the Secretary <br />shall allocate the total costs of constructing said unit, project, or <br />feature to the various purposes authorized in the act or authorized <br />under reclamation law. No projects or units have been completed; <br />therefore, no formal allocations to the several purposes to be served <br />by the project have been made of the cost to June 30, 1960. How- <br />ever, tentative allocations have been made of the total estimated cost <br />to complete the entire project (schedule No.5). The tentative a1l0- <br />cations may be summarized as follows: <br /> <br />Purpose <br /> <br />Reimbursable allocations: <br />rrrigation"._h'___"'__~_~_______h__d__________...__________________.h__. <br />Power________________________________________________________._._.____.__. <br />MunIoipal and Industrlal water. _ _ __________________.______._____._______. <br />TotsL._.___________________________________________________.__._.____. <br />Nonre!mblll'sable allocations: <br />Flood control.. _ 0_ _ _ __ _ __ _ _ ___ ____ ___ ___~ _ ~_ _ _~__~__ _.__ _._ _ ~_. _ .__ ~_._ _~_ ~ <br />FiSb and w:IIdllfe _ _ ~ _ u~_ _~_ _d_. __ _.~ __ ___ _ _h _ __._ __._ _~_ ~ _._ _ __h h__ ._. <br />Rect6atlon_____~_~______._._____.________~_~___~~_._~_~__.___~_~______~_~_ <br />Otber nonreimbursable costs: Colorado River developmllnt fund investI- <br />gations and non-Federal contrlbutions_~______~_____.~_.___~______~____~_ <br />Total. _____ _____ _.~._.h ..~ _~~ ._____ ___ ._. ._. ___ __ __ __ _ __ _~. h h __ ~___ <br />Unallocated costs: Ultimate pbase costs of central Utah participating projecL. <br />TotaL_____h__.____.___~.______~_~_______________._.~.___h~_~__._______ <br /> <br />Amount <br />(thousands) <br /> <br />$306,571 <br />671,Y56 <br />46,644 <br />1,025,171 <br /> <br />3,866 <br />24,109 <br />20,875 <br />6,433 <br />54,283 <br />6,760 <br />1,085,204 <br /> <br />Percent <br /> <br />28.2 <br />62.() <br />4.3 <br />1)4.& <br /> <br />.3 <br />2.3 <br />I.' <br />.. <br />5.0 <br />.. <br />loo.1) <br />