Laserfiche WebLink
<br />cr <br /> <br />,... <br />. . <br />C'. <br /> <br />C'~ <br /> <br />c <br /> <br />1 fifty (50) years after the date 8t which electrical energy <br /> <br />2 would be ready for delivery to the City as provided thereinj and <br /> <br />3 <br /> <br />5. \VHE REAS , under the Lease, the generation of <br /> <br />4 electrical energy allocated to the states of Nevada and Arirona, <br /> <br />5 the municipalities of Burbank, Glendale and Pasadena (herein- <br /> <br />6 after referred to as the "Municipalities"), The Metropolitan <br /> <br />7 Water District of Southern California (hereinafter referred to <br /> <br />8 as the "District"), and Los Angeles Gas and Electric Corporation <br /> <br />9 is required to be effected by the CitYj and <br /> <br />10 6. WHEREAS, under the Lease, the generation of elec- <br /> <br />11 trical energy allocated to The Nevada-California Electric <br /> <br />12 Corporation (successor in interest to The Southern Sierras Power <br /> <br />13 Company) is required to be effected by Edison Company (The Nevad8.- <br /> <br />14 California Electric Corporation and Edison Company being herein- <br /> <br />15 after collectively referred to as the "Companies") j and <br /> <br />16 <br /> <br />7. Vi1lEREAS, the Uni tad States, pursuant to the <br /> <br />17 provisions of the Project Act and tl1e above recited provisions <br /> <br />18 of the Lease, has constructGd a dam (herein referred to as the <br /> <br />19 "dam" or "Boulder Dam") and constructed thereat a power plant <br /> <br />20 and incidental structures (herein, together 'Wi th additional <br /> <br />21 facilities and incidental structures in the course of con- <br /> <br />22 struction or contemplated, collectively referred to as the <br /> <br />23 "Boulder Power Plant"); and <br /> <br />24 <br /> <br />8. WHEREAS, the City and Edison Company, and oallh <br /> <br />25 of them, hps, in reliance upon the provisions of the Lease, <br /> <br />4 <br />