My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09314
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09314
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:52:47 PM
Creation date
10/12/2006 3:34:44 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.200.05.R
Description
Hoover Dam/Lake Mead/Boulder Canyon Project
Basin
Colorado Mainstem
Date
2/19/1941
Title
Draft of Proposed Findings and Recommendations for the Effectuation of Boulder Canyon Project Adjustment Act: Part II
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />cr <br /> <br />,... <br />. . <br />C'. <br /> <br />C'~ <br /> <br />c <br /> <br />1 fifty (50) years after the date 8t which electrical energy <br /> <br />2 would be ready for delivery to the City as provided thereinj and <br /> <br />3 <br /> <br />5. \VHE REAS , under the Lease, the generation of <br /> <br />4 electrical energy allocated to the states of Nevada and Arirona, <br /> <br />5 the municipalities of Burbank, Glendale and Pasadena (herein- <br /> <br />6 after referred to as the "Municipalities"), The Metropolitan <br /> <br />7 Water District of Southern California (hereinafter referred to <br /> <br />8 as the "District"), and Los Angeles Gas and Electric Corporation <br /> <br />9 is required to be effected by the CitYj and <br /> <br />10 6. WHEREAS, under the Lease, the generation of elec- <br /> <br />11 trical energy allocated to The Nevada-California Electric <br /> <br />12 Corporation (successor in interest to The Southern Sierras Power <br /> <br />13 Company) is required to be effected by Edison Company (The Nevad8.- <br /> <br />14 California Electric Corporation and Edison Company being herein- <br /> <br />15 after collectively referred to as the "Companies") j and <br /> <br />16 <br /> <br />7. Vi1lEREAS, the Uni tad States, pursuant to the <br /> <br />17 provisions of the Project Act and tl1e above recited provisions <br /> <br />18 of the Lease, has constructGd a dam (herein referred to as the <br /> <br />19 "dam" or "Boulder Dam") and constructed thereat a power plant <br /> <br />20 and incidental structures (herein, together 'Wi th additional <br /> <br />21 facilities and incidental structures in the course of con- <br /> <br />22 struction or contemplated, collectively referred to as the <br /> <br />23 "Boulder Power Plant"); and <br /> <br />24 <br /> <br />8. WHEREAS, the City and Edison Company, and oallh <br /> <br />25 of them, hps, in reliance upon the provisions of the Lease, <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.