My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09314
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09314
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:52:47 PM
Creation date
10/12/2006 3:34:44 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.200.05.R
Description
Hoover Dam/Lake Mead/Boulder Canyon Project
Basin
Colorado Mainstem
Date
2/19/1941
Title
Draft of Proposed Findings and Recommendations for the Effectuation of Boulder Canyon Project Adjustment Act: Part II
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />l!? <br />C": <br />C"". <br />C'! <br /> <br />c <br /> <br />1 also construct in connection therevnti1 outlet works, pressure <br /> <br />2 tunnels, penstocks, power plant building, and furnish and <br /> <br />3 install genera,ting, transforming, and high-voltage switching <br /> <br />4 equipment for the generation of the electrical energy allocated <br /> <br />5 to the various allottees, respectively, as stated in the Lease; <br /> <br />6 and <br /> <br />7 <br /> <br />4. ~1mREAS, under the Lease, the United states <br /> <br />8 leased to the City for fifty (50 ) years from the date at which <br /> <br />9 electrical energy would be rea~J for delivel~ to the City, as <br /> <br />10 announced by the Secretary in accordance with Article 11 of <br /> <br />11 the Lease, such power plant lU1its and corresponding plant <br /> <br />12 facilities and incidental structures at Boulder Dam as might <br /> <br />13 be necessary to generate the electrical enGrgy all:Jcated to <br /> <br />14 the City and electrical energy for those allottees for which <br /> <br />15 the City was therein designated the gone rating agoncy, together <br /> <br />16 with the right to generate such electrical energy; and leased <br /> <br />17 to Edison Company such power plan t units and corresponding plant <br /> <br />18 facili ties and incidental structurGs at Boulder Dam as might <br /> <br />19 be necessary to generate the electrical energy allocated to it <br /> <br />20 and electrical energy for those allottees for which Edison <br /> <br />21 Company was therein designated the generating agency, together <br /> <br />22 with the right to gGncrate such electrical energy, for a period <br /> <br />23 beginning with the date at which the first of such power plant <br /> <br />24 units would be ready for operation and wat8r would bo available <br /> <br />25 therefor as announced by the S8crct8,ry and ending at a time <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.