My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09314
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09314
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:52:47 PM
Creation date
10/12/2006 3:34:44 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.200.05.R
Description
Hoover Dam/Lake Mead/Boulder Canyon Project
Basin
Colorado Mainstem
Date
2/19/1941
Title
Draft of Proposed Findings and Recommendations for the Effectuation of Boulder Canyon Project Adjustment Act: Part II
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br />co <br />c-. <br />C\J <br />C <br /> <br />1 Article 17 (k) hereof, shall remain in charge of the repair or <br /> <br />2 operation of any part of the Boulder Power Plant included in the <br /> <br />3 properties to be operated by either Operating Agent for a period <br /> <br />4 of more than thirty (30) days, the Secretary shall be deemed to <br /> <br />5 be in possession of said part of said plant under the provisions <br /> <br />6 of this Article, and the Secretary may thereupon give the four- <br /> <br />7 year notice of termination provided for herein. At any time <br /> <br />8 after entry by the Secretary under this Article or after he shall <br /> <br />9 be deemed to be in possession under this Article and prior to the <br /> <br />10 expiration of said four-year period such Operating Agent shall be <br /> <br />II reinstated and shall have restored to it all rights which it had <br /> <br />12 under this contract prior to the time of said breach, upon <br /> <br />13 removing, in a manner determined by the Secretary to be adequate, <br /> <br />14 all causes which resulted in such entry and taking possession, or <br /> <br />15 upon giving assurances determined by the Secretary to be adequate <br /> <br />16 that such causes will be removed, and upon paying to the United <br /> <br />17 States any and all costs incurred by it by reason of such breach <br /> <br />18 which the Secretary shall determine to be in excess of the costs <br /> <br />19 which would have been incurred in the operation and maintenance <br /> <br />20 of the power plant if such breach had not occurred. Upon the <br /> <br />21 expiration of said four-year period, unless the breach or default <br /> <br />22 has been cured and such Operating Agent reinstated, this contract <br /> <br />23 shall terminate and be of no further force or effect as to such <br /> <br />24 Operating Agent. Upon any such termination as herein provided, <br /> <br />25 all property of the United States in the possession of such <br /> <br />34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.