My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09314
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09314
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:52:47 PM
Creation date
10/12/2006 3:34:44 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.200.05.R
Description
Hoover Dam/Lake Mead/Boulder Canyon Project
Basin
Colorado Mainstem
Date
2/19/1941
Title
Draft of Proposed Findings and Recommendations for the Effectuation of Boulder Canyon Project Adjustment Act: Part II
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />l!": <br />~ <br />r <br />C'" <br />C 1 <br /> 2 <br /> 3 <br /> 4 <br /> <br />been approved by the Director, after notice to any allottee <br /> <br />affected and opportunity to such allottee to be heard upon such <br /> <br />application of the Operating Agent, pursuant to this Article <br /> <br /> <br />22 (k) or by the Secretary on appeal pursuant to Article 26 (a) <br /> <br />5 hereof. <br /> <br />6 Remedies for Breach of Contract <br /> <br />'1 <br /> <br />23. (a) If the Secretary deterLunes that either <br /> <br />8 Operating Agent has committed a breach of this contract which <br /> <br />9 deprives another allottee or contractor or the United States of <br /> <br />10 electrical energy which it is the duty of such agent to deliver <br /> <br />11 under Article 21 hereof, and such Operating Agent shall continue <br /> <br />12 so to breach the contract for three (3) days after receipt of <br /> <br />13 written notice of such determination from the Secretary to such <br /> <br />14 Operating Agent, or if the Secretary determines that either <br /> <br />15 Operating Agent has committed any other material breach of this <br /> <br />16 contract, and such breach shall continue for thirty (30) days <br /> <br />1'1 after receipt of written notice of such determination from the <br /> <br />18 Secretary to such Operating Agent, the Secretary may give 4 years' <br /> <br />19 notice of termination of this contract as to such Operating Agent <br /> <br />20 and may at any time after such notice is given enter, take <br /> <br />21 possession of, and operate, maintain and make replacen~nts of so <br /> <br />22 much of the part of Boulder Power Plant operated by such <br /> <br />23 Operating Agent as may be necessary to remedy such breach. Said <br /> <br />24 notice shall include a statement of the circu~stances constituting <br /> <br />25 the breach. If the Director, pursuant to the provisions of <br /> <br />33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.