My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09314
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09314
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:52:47 PM
Creation date
10/12/2006 3:34:44 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.200.05.R
Description
Hoover Dam/Lake Mead/Boulder Canyon Project
Basin
Colorado Mainstem
Date
2/19/1941
Title
Draft of Proposed Findings and Recommendations for the Effectuation of Boulder Canyon Project Adjustment Act: Part II
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />C"': <br />l!':l <br />'(", <br />~-' <br /> <br />1 the allottees and the contractors served by it of any such <br /> <br />c <br /> <br />2 notices and shall, from time to time, as far as is practicable, <br /> <br />3 on the hasis of such notices, and its knowledge of the load <br /> <br />4 requir ements of such allottees and of such contractors, make <br /> <br />5 recommendations to the Director respecting the design, capacity, <br /> <br />6 and time of installation of additional generating machinery and <br /> <br />7 equipmm t, to the end that additional machineY'J and equipment <br /> <br />8 may be made available by the United states in accordance ",lith <br /> <br />9 its obligations. It shall be the duvJ of each Operating Agent <br /> <br />10 to co opera te "nth the United states in the preparation of designs <br /> <br />11 for' additional machinery and equipment required by it, and in tre <br /> <br />12 preparation of plans and specifications therefor. Each Operating <br /> <br />13 Agent and allottee affected there~J shall have the opportunity to <br /> <br />14 be heard by the Secreta!'J or joJ.s representatives, upon the design <br /> <br />15 and capacity of additional Ilk'tcbinery aIJd equipment to be provided <br /> <br />16 and installed by the United states, before proposals for the <br /> <br />17 furnishing of the same C'.re invited, and to consider all proposals <br /> <br />18 received;:md to make r8commendations as to the letting of contracts <br /> <br />19 before the same ore let, but the determirlo'Ction of the Secretary on <br /> <br />20 these matters shall be final. <br /> <br />21 <br /> <br />(m) Subje ct to the statutory requirement that Boulder <br /> <br />22 Dam and the reservoir created thereby shall be used: First, for <br /> <br />23 river regulation, improvement of Il2.vigation, ;:md flood control; <br /> <br />24 second, for irrigation end domestic uses and satisfaction of <br />25 perfected rights mentioned in Section six of the Project P_ct; <br /> <br />;q. <br />
The URL can be used to link to this page
Your browser does not support the video tag.