My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09314
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09314
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:52:47 PM
Creation date
10/12/2006 3:34:44 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.200.05.R
Description
Hoover Dam/Lake Mead/Boulder Canyon Project
Basin
Colorado Mainstem
Date
2/19/1941
Title
Draft of Proposed Findings and Recommendations for the Effectuation of Boulder Canyon Project Adjustment Act: Part II
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'J <br />!") <br />:---, <br />:'oJ <br /> <br />- <br />-' <br /> <br />1 shall, upon direction from the Djrector, promptly change its <br /> <br />2 method of oper a:tioD so as to avoid or remove the danger, and <br /> <br />3 in case of its negle ct so to do, t'1e 'Dire ctor may, at his option, <br /> <br />4 in addition to any other remedy available to the United States, <br /> <br />5 take charge of the opera tiOD of so much of the machinery, equip- <br /> <br />6 ment or other property under the control of said Operating Agent <br /> <br />7 as may be necessary for the avoidance or removal of the danger, <br /> <br />8 and mC\'{ contin1Je in charge thereof until he shall have received <br /> <br />9 from such Operating Agent adequate assurances that such improper <br /> <br />10 operation will not recur, or until, on appeal, his directions <br /> <br />11 sball have been reversed by the Secretary. <br /> <br />12 <br /> <br />(Hi) All costs incurred by the United States under <br /> <br /> <br />13 this Article 17 (k) shall be determined and billed or charged <br /> <br />14 in the same ~~er as provided by l\rticle 17 (h). <br /> <br />15 <br /> <br />(1) It shall be the d:ut~r of each Operating Agent to <br /> <br />16 keep informed, as far as practicable, of the requirements for <br /> <br />17 electrical energy of each allottee and of each contractor, and <br /> <br />18 to that end the Secretary shall require of all allottees and <br /> <br />19 of all contractors advance notice to the Operating i.gent or <br /> <br />20 Agents affected of their requirements, or of their additional <br /> <br />21 or decreased requirements, including est:imates of kilOl'ratt <br /> <br />22 hours, maximum demands, anticipated annual load curves by months, <br /> <br />23 and all other information necessary to enable the Operating <br /> <br />24 Agents to make the recomendations hereinafter required. Each <br /> <br />25 Operat:ing AgED t shall inform the Dire ctor of the receipt from <br /> <br />29:' <br />
The URL can be used to link to this page
Your browser does not support the video tag.