My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09314
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09314
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:52:47 PM
Creation date
10/12/2006 3:34:44 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.200.05.R
Description
Hoover Dam/Lake Mead/Boulder Canyon Project
Basin
Colorado Mainstem
Date
2/19/1941
Title
Draft of Proposed Findings and Recommendations for the Effectuation of Boulder Canyon Project Adjustment Act: Part II
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br /> <br />C": <br /> <br />C'". <br />C'\J <br /> <br />c <br /> <br />1 and upon terms and conditions which will enable the said <br /> <br />2 oDe rating agents to operate their respective portions of <br /> <br />3 tJoe Boulder Power Plant in inte,o:r-ation with other sources <br /> <br />4 of supply awned or controlled by said operating agents, and <br /> <br />5 in such manner as to meet the exacting requirements of the <br /> <br />6 metropolitan areas served by them; and upon condition that the <br /> <br />7 provisions mentioned in Article 10 hereof are incorporated in <br /> <br />8 such agency contract; and <br /> <br />9 <br /> <br />12. WHEREAS, the Secretary is willing that the City <br /> <br />10 and Edison Company be designated as such operating agents on <br /> <br />11 the terms and conditions mentioned in Article 11 hereof, if <br /> <br />12 it be also provided that, subject to such prior right of the <br /> <br />13 operating agents to op8rate the Boulder Power Plant in integra- <br /> <br />14 tion with their other sources of supply, it will be operated so <br /> <br />15 as to provide for the economical and efficient use of generating <br /> <br />16 machinery and equipment at the Boulder Power Plant and the <br /> <br />17 economical and efficient use of water at the Boulder Canyon <br /> <br />18 Project, cmd as between said project and any other project <br /> <br />19 on the Colorado River under the jurisdiction of the Secretary <br /> <br />20 at which power is or may be developed; <br /> <br />2l <br /> <br />13. NOW, THEREFORE, in consideration of the provi- <br /> <br />22 sions, covenants and conditions herein contained, the parties <br /> <br />23 hereto agreE; as follows, to wit: <br /> <br />24 Termination of Lea.se <br /> <br />25 <br /> <br />14. At the time specified in Article 15 (d) hereof, <br /> <br />26 for the cOIlUllencement of the operation of the Boulder Power Plmt <br /> <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.