My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09314
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09314
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:52:47 PM
Creation date
10/12/2006 3:34:44 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.200.05.R
Description
Hoover Dam/Lake Mead/Boulder Canyon Project
Basin
Colorado Mainstem
Date
2/19/1941
Title
Draft of Proposed Findings and Recommendations for the Effectuation of Boulder Canyon Project Adjustment Act: Part II
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />o <br />'l::"' <br />I:"' <br />e",/ <br /> <br />1 by the United states through the agents hereinafter designated, <br /> <br />c <br /> <br />2 the Lease shall terminate. <br /> <br />3 Designa tion of Operating Agents and <br />4 Term of Operation <br /> <br />5 <br /> <br />15 (a) The City is hereby designated as the agent <br /> <br />6 of the United States for the operation and maintenance, and <br /> <br />7 the making of replacements, however necessitated, of that por- <br /> <br />8 tion of the Boulder PO'I'rer Plan t which from time to time during <br /> <br />9 the term of such agency may be necessary for the generation of <br /> <br />10 electrical energy to be taken (1) by the City, the States of <br /> <br />11 Arizona and Nevada" the District and the Municipalities, their <br /> <br />12 successors or assigns, (2) by the United States, under any <br /> <br />13 right now existing or hereafter reserved, out of the Cityls <br /> <br />14 allocation, or (3) by any taker (including the United States, <br /> <br />15 but excluding the Companies, their successors or assigns), <br /> <br />16 which under any right now existing or hereafter created may <br /> <br />17 take any portion of the electrical energy now or hereafter <br /> <br />18 allocated to, 1:ut not taken by, the City, the States of <br /> <br />, <br /> <br />19 Arizona or Nevada, the District or the Municipalities, their <br /> <br />J~ <br /> <br />r; <br /> <br />20 successors or assigns; and the City hereby agrees to act as <br /> <br />" <br />~-;. <br /> <br />21 such agent. <br /> <br />~ <br />~..i <br />.' <br />{:' <br /> <br />22 <br /> <br />(b) Edison Company is hereby designated as the <br /> <br />23 agent of the United States for the operation and maintenance, <br /> <br />24 and the making of replacemunts, howGwrnecessitated, of that <br /> <br />, <br /> <br />25 portion of the Boulder Powcr Plant which from time to time <br /> <br />I <br /> <br />8 <br /> <br />~:t <br />-".' <br />:>: <br />
The URL can be used to link to this page
Your browser does not support the video tag.