My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09277
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09277
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:52:27 PM
Creation date
10/12/2006 3:33:48 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8441.700
Description
Colorado Big Thompson Project - Annual Operating Plans
Basin
South Platte
Water Division
1
Date
1/1/1998
Title
Annual Operating Plans - Colorado Big Thompson Project and Western Division System Power Operations - Water Year 1998 Summary of Actual Operations
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />2. Operation during snowmelt period (April-July) <br /> <br />a. Bypass inflow, as required, to supply downstream vested rights. <br /> <br />o <br />o <br />.... <br />~ <br />(1:1. <br />Q <br /> <br />b. Replace water withheld by the CBT Project, as required. <br /> <br />c. Make required releases for west slope natural flow irrigation and domestic water <br />users depletions. <br />d. Reduce releases from traditional levels before and after the peak flow enhancement for the <br />Coordinated Reservoir Operations effort. During peak flow enhancement, release the <br />lesser of inflows or turbine capacity (approx. 1500 ft3/s) for approximately a ten-day <br />period; . <br /> <br />e. On or before June 30, each year, assess availability of swplus water in the Historic <br />Users Pool (HUP), on a regular basis, in consultation with the Managing Entities <br />established under the settlement of the Orchard Mesa Check Case. <br /> <br />f. If a surplus condition is declared in the HUP, make releases, under agreement, to the <br />Orand Valley Power Plant to the lesser of the amount of the surplus or the capacity of the <br />Grand Valley Power plant canal system or the amount needed to generate power at the <br />Grand Valley Power Plant. <br /> <br />g. Release surplus amounts to other needs downstream. <br /> <br />h. Make required releases for contract water depletions. <br /> <br />i. Fill without spilling. <br /> <br />j. Maximize power operation consistent with I.e. <br /> <br />k. Make releases as outlined in the above referenced documents. I <br /> <br />3. Operation after snowmelt period (August-October) <br /> <br />a. Bypass inflow as required, to supply downstream vested rights. <br /> <br />b. Replace water withheld by the CBT Project, as required. <br /> <br />c. Make required releases for west slope natural flow irrigation and <br />domestic water users depletions. <br /> <br />d. Assess availability of surplus water in the Historic Users Pool (HUP), on a regular <br />basis, in consultation with the Managing Entities established under the settlement of the <br />Orchard Mesa Check Case. <br /> <br />e. If a surplus condition is declared in the HUP, make releases, under agreement, to the <br />Grand Valley Power Plant to the lesser of the anlount of the surplus or the capacity of the <br />20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.