Laserfiche WebLink
<br />o <br />o <br />...... <br />(.0 <br />CT.\ <br />"""' <br /> <br />Grand Valley Power plant canal system or the amount needed to generate power at the <br />Grand V alley Power Plant. <br /> <br />f. Make required releases for contract water depletions. <br /> <br />g. Release to other surplus amounts. <br /> <br />h. Maximize power operation consistent with I.e. <br /> <br />i. Make releases as outlined in the above referenced documents. <br /> <br />I By the use of these criteria for current operating purposes, the United States does not intend to imply <br />any definition of rights and obligations. The order in which these criteria are listed does not reflect any <br />intended priority. <br /> <br />21 <br />