My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09277
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09277
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:52:27 PM
Creation date
10/12/2006 3:33:48 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8441.700
Description
Colorado Big Thompson Project - Annual Operating Plans
Basin
South Platte
Water Division
1
Date
1/1/1998
Title
Annual Operating Plans - Colorado Big Thompson Project and Western Division System Power Operations - Water Year 1998 Summary of Actual Operations
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />o <br />c:> <br />.... <br />(.., <br />CJl <br />(Q <br /> <br />OPERATING CRITERIA FOR GREEN MOUNTAIN RESERVOIR <br /> <br />Paragraph 6 of the October 5, 1955, Stipulation and Decree (as amended on October 12, 1955, and filed <br />with the United States District Court for the District of Colorado in civil action Nos. 2782, 5016, and <br />5017) cans for the development and submission of operating plans for Green Mountain Reservoir and <br />are included as a part of this report. Paragraph 3.e.(1) of the Green Mountain Historic Users Pool (HUP) <br />Operating Criteria, developed pursuant to Paragraph 5.a. of the Stipulation and Agreement of the <br />Orchard Mesa Check Case (case No. 91 CW247, Colo. Water Div. 5) calls for the annual development of <br />an HUP Operating Plan which is included in the following criteria. <br /> <br />The provisions that relate to the operation of Green Mountain Reservoir are contained in the: <br /> <br />October 12, 1955, Stipulation and Decree <br />April 16, 1964, Stipulation and Decree <br />November 2,1977, Memorandum Opinion and Order <br />February 9, 1978, Supplemental Judgment and Decree <br />Consolidated Case Nos. 2782, 5016, and 5017 <br />Senate Document No. 80, 75th Congress, 1st Session <br />December 22, 1983, Federal Register, Operating Policy as amended September 11, 1987 <br />September 4, 1996, Stipulation and Agreement of the Orchard Mesa. Check Case, <br />Colorado Water Div. 5, 91 CW247 and attached HUP Operating Criteria. <br /> <br />Operations will be consistent with these provisions. <br /> <br />The criteria are listed below. <br /> <br />1. Winter operation (November-March) <br /> <br />a. Bypass inflow to supply downstream vested rights. <br /> <br />b. Replace water withheld by the CBT Project, as required. <br /> <br />c. Make required releases for west slope natural flow domestic <br />water users depletions per Green Mountain Operating Policy and Orchard Mesa <br />Check case Settlement. <br /> <br />d. Make required releases for contract water depletions. <br /> <br />e. Maximize power generation, while maintaining: <br /> <br />(1) Adequate storage to meet the anticipated requirements of Senate Document <br />No. 80 and the agreements under the Stipulation and Agreement of the Orchard <br />Mesa Check Case. <br /> <br />(2) A minimum power head, which is consistent with the integrated system power <br />operations. <br /> <br />19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.