My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09122
CWCB
>
Water Supply Protection
>
DayForward
>
1-1000
>
WSP09122
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 8:52:11 PM
Creation date
10/12/2006 3:28:31 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8040.100
Description
Section D General Studies-Power
Date
1/1/1981
Author
DOI
Title
Dunham Point-Peaking Power Unit-Plan of Study-Colorado River Storage Project Power Peaking Capacity
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1n r~apter T. the study report will <br /> <br />a~rlress t~e transmission system <br /> <br />necessary to uti.1ize t'1e: pumpen storage pt"o.;ect: ~owever. tt,e l.;rF:'~tern Area <br /> <br />Po'toTer Administration will he responsible for the transmission system <br /> <br />. <br /> <br />!;tudy, <br /> <br />inc1uding alternative corridors. <br /> <br />It is anticipatp~ Western will <br /> <br />e!;t~mate a new transmission system for t~e entirp re~ion nlu~ the specific <br /> <br />svstelTl needed to transmit the Dunham Point pnwp.r to t'hat network. <br /> <br />Past experi.ence t\'ith pumped storage pro.iects l,a~ shown t~at: tl-tp <br /> <br />geo1ogv of the site 15 critical. <br /> <br />To aSSllre that tt,~re are viab'p <br /> <br />a~teTnat~ves. a ~eol.ogic investigation program iR qch~du1e~ in t~e plan <br /> <br />formulation stage. <br /> <br />The alternative plaTls for t"e:.> pToposeil pm.1Pt' plant s"ou1r1 he c"o!;en in <br /> <br />order to assess the sen~itiv;tv of va:ious sizes to pvaluation factors. <br /> <br />Tl1e a1 ternativp. pl ans mu!;t meet t~e fonr tests (as rlescri,">pr) belO'1:\T"l set <br /> <br />fortt, in the Principals and Stan~ar~s faT Multiple nbipctiv~ Planning of <br /> <br />Water Resources to hecome candi~~te plans f()~ poss~~le ~elpcr.ion. The <br /> <br />four tests are: <br /> <br />. <br /> <br />~. ~omplete ~n tl-tat ornvisio~ 15 mane for al~ necessarv investments <br /> <br />or actions nepded to RSSUre fu11 ~ealization of th~ p1ans. <br /> <br />,. Effective 1n accomp~is~ing tl-te o~.i~ctives. <br /> <br />3. l?fficient 1.n ac"'ievi.n~ a Q;iven 1evel of performance at t"e lea!;t <br /> <br />cost. <br /> <br />4. Acceptable to tJ-te puh~ic and. compatil)'.e witl-t insti.tuti.onal <br /> <br />t:'estraints. <br /> <br />Se1ection of P~eferred Plan <br /> <br />Once the can~i.date plans are <br /> <br />identi fied. <br /> <br />tl-te o1anning team. ~'7ith <br /> <br />assi~tance from t"'e subteams. 'toTill arrava four account evc:tl.l1ati.on of thp. <br />.. <br />. \ . <br />sites And reconnne:.>nd a plan or p1ans to he ~nvestigated at tl,e feasil,ility <br /> <br />. <br /> <br />.'e~~l.. Again a decision to forego tl-te proiect is possih1~. <br /> <br />21) <br />
The URL can be used to link to this page
Your browser does not support the video tag.