My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09122
CWCB
>
Water Supply Protection
>
DayForward
>
1-1000
>
WSP09122
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 8:52:11 PM
Creation date
10/12/2006 3:28:31 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8040.100
Description
Section D General Studies-Power
Date
1/1/1981
Author
DOI
Title
Dunham Point-Peaking Power Unit-Plan of Study-Colorado River Storage Project Power Peaking Capacity
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CHAPTER IV <br /> <br />PLAN FORMULATION PROCESS <br /> <br />. <br /> <br />The plan formulation process includes those activities related to <br /> <br />identification of problems and needs, the identi.fication and evaluation of <br /> <br />alternative plans, the selection of a preferred size and layout~, and com- <br /> <br />pariscn <br /> <br />of <br /> <br />t"e <br /> <br />pr.eferred alternatives to a future <br /> <br />~r;.tl-tout-pl an <br /> <br />alternative. <br /> <br />Identification of Problems and Needs <br /> <br />The i~entification of oroblems an~ neens sta~e of the study would <br /> <br />determine: <br /> <br />1) if t~ere are existi.ng needs in the project area t~at should <br /> <br />be <br /> <br />consideren. and 2) what potential prohlems would <br /> <br />arise <br /> <br />from <br /> <br />;mplementat ion of the proposed pro.iec t. 1"'1i s sta~e requi res t"e invol ve- <br /> <br />ment of all the teams wi t~ Water ano Power l"avi.ng overall <br /> <br />responsihi 1 i.ty <br /> <br />. <br /> <br />for comprehensiveness. <br /> <br />Tl"e initial t~Tu~t of the teams ~oulrl be to determine and list tl-te <br /> <br />proh~eflS and needs ~o that spec~fic studies to ~ddr~ss si~nlficant Pyo~- <br /> <br />lp.ms and needs can he ;.ni.tiaten. T'he prohlems and np.ens evaluation would <br /> <br />provide th~ ~asis for scoping of proiect impacts. <br /> <br />Development of Al. ternati.ve Pl ans <br /> <br />Alternative plans for A Dun~am Point Unit are very limited. <br /> <br />Any al- <br /> <br />ternative would ~ave to utilize McP~ee Reservoir and the forehay reSp.~VOlr <br /> <br />91. te on Dunham Poi nt hecause no ot~e-r forehay sites ex; s t tha tAre close <br /> <br />to McPhee Reservol.r and have p.noug'h elevation di.fference. Tl1e alte.rnative <br /> <br />plans 'vou1d be rest-ricted to sizes of the ~umperl storage p-rojp.ct from no <br /> <br />. <br /> <br />project to some maximum size: also, t~ere are alternative met~ods of <br /> <br />installing the penstock hetween t~e two reservoirs. As stated <br /> <br />. <br /> <br />, <br /> <br />,'13 <br /> <br />19 <br /> <br />.., <br />.~, <br />
The URL can be used to link to this page
Your browser does not support the video tag.