My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09039
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09039
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:50:49 PM
Creation date
10/12/2006 3:25:18 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8543
Description
Closed Basin Division
State
CO
Basin
Rio Grande
Water Division
3
Date
1/25/1963
Title
A Report on the Current Status and Recent History of the Closed Basin Division of the San Luis Valley Project
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CJ) <br />lf~~ <br />'i~"'1 <br />.-I <br />:) <br />\~,,) <br /> <br />The plan contemplates that construction, operation and <br /> <br />maintenance of the water salvage features would be a non- <br /> <br />reimbursable federal expense, This recognizes that the <br /> <br />proposed delivery of the salvaged water to the Rio Grande <br /> <br />to improve the state of Colorado's debit condition under the <br /> <br />Rio Grande Compact would be of benefit to all Rio Grande Com- <br /> <br />pact states and to the Nation." <br /> <br />At page five of the letter we find the following <br /> <br />language: <br /> <br />"The evaluation benefits are estimated to total $2,638,000 <br /> <br />annually, The ratio of evaluated total annual benefits to <br /> <br />estimated federal costs is 6,75 to 1.0," <br /> <br />At page 27 in the body of the report the following two <br /> <br />paragraphs are significant: <br /> <br />"As discussed subsequently under stage development, the <br /> <br />plan of development contemplates that development of the <br /> <br />well fields will be a step-by-step process, extending over <br /> <br />several years, Under this procedure, wells would be in- <br /> <br />stalled and tested in a sequence which would establish the <br /> <br />aquifer conditions which prevail and would permit modifica- <br /> <br />tions in the well spacings and capacities to accommodate the <br /> <br />variations encountered, <br /> <br />The plan contemplates the installation of observation wells <br /> <br />along the perimeter of the overall water salvage area, <br /> <br />-6- <br />
The URL can be used to link to this page
Your browser does not support the video tag.