My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08998
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:50:34 PM
Creation date
10/12/2006 3:24:14 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.200.05
Description
CRSP - Boulder Dam
Basin
Colorado Mainstem
Water Division
1
Date
10/31/1938
Title
Report of Competitive Value of Falling Water for Primary Energy at Boulder Dam in Competition with Steam Power at the Load Center
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />. <br /> <br />. <br /> <br /> <br />. <br /> <br />o <br />r."~) <br />~ <br />~ <br />e,.,) <br />~, <br /> <br />26. <br /> <br /> <br />of tetermining the value of secondary "'nergy, hO'7ever, <br />see s relatively unimportant in this problem due to the <br />sma 1 r.mount of revenue "'hich nill be derived therefrom <br />rmd .in the future its value "ill be determined by a formula <br />incl~ded in rherhirc'l Circuit Contract, "rhich no':) exists <br />bet'''ran the Bureau of Po,.ter and Light and the United States <br />Govetnmen t. <br />. :f it is assumed the entire output of primary <br />at Joulder Power Plant would be delivered to the Los <br /> <br /> <br />;~ <br /> <br />Angel's metropolitan ,9.rea, there ".'ould be required three <br /> <br /> <br />group. of oircui t s, consisting of t'70 groups of t"'o circuit s <br /> <br /> <br />oach nd one group of three circuits, totalling at least <br /> <br /> <br />soven circuits in r..ll. Zach group of circui ts ',~ould require <br /> <br />its 0' <br /> <br />steam standby spinning reserve to insure the proper <br /> <br />reUs. <br /> <br /> <br />of service for transmission. rho minimum steam <br /> <br />stand <br /> <br />for all three groups '-'aUld be 240,coo k\:'., which is <br /> <br />only s fficient in a system of this size to provide against <br />the 10 s of !{ double circui t to"'er line. <br /> <br />While I do not agree "'ith 1::1'. Sands' basic assump- <br /> <br />tions f dGli vering Joulder Canyon pO'fTor over long distance <br /> <br /> <br />transm ssion lines at system load factor, either from an <br /> <br />-~ <br />1 <br /> <br />economi standpoint or from the standpoint of reliability <br /> <br />1 <br /> <br />of serv ce, nevertheless: have made a parallel study, the <br /> <br /> <br />details for '"hich are sho'-;n in rable Il, malting certa.in ob- <br /> <br />" <br /> <br />t <br /> <br />vicus cJrrections <br /> <br />I <br />I <br />, <br /> <br /> <br />\ <br /> <br />I <br /> <br />as previously set forth in order to get <br /> <br />, <br />:t <br /> <br />J <br /> <br />~ <br />1 <br />,} <br /> <br />A. 0. Roberts <br /> <br />;\ <br />
The URL can be used to link to this page
Your browser does not support the video tag.