My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08998
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:50:34 PM
Creation date
10/12/2006 3:24:14 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.200.05
Description
CRSP - Boulder Dam
Basin
Colorado Mainstem
Water Division
1
Date
10/31/1938
Title
Report of Competitive Value of Falling Water for Primary Energy at Boulder Dam in Competition with Steam Power at the Load Center
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> ; (:;0 incoln and expense. Ey knowledge of the Bureau's business <br />. ' '~') <br />. !/lI'" load system will <br /> ~ leads me to believe that the factor of the <br /> ~ incre during 50 and that of 55.% may be <br /> ~ se years an average <br /> <br />. <br /> <br /> <br />. <br /> <br />safel used for studies of this nature over a period of 50 <br /> <br />years. <br /> <br />Cn page 6 of J\1r, Sandsl report he shows a total <br /> <br /> <br />genera ing capacity of 9g7,OOO kw. at an average load fac- <br /> <br /> <br />tor of 49.4% which equals the firm obligation of <br /> <br /> <br />4,277, 00,000 kw-hrs. per year. With st% loss as assumed <br /> <br /> <br />by Mr, Sands this is an equivalent of 903,563 kw. delivered <br /> <br /> <br />in Los Angeles. <br /> <br /> <br />Cn page lO of Mr. Sandsl report he assumes a total <br /> <br /> <br />instal tion of six transmission circuits, which would mean <br /> <br /> <br />that t delivered load on each circuit would be l50,930 kW, <br /> <br /> <br />rhis is in excess of the safe transmission capacity for <br /> <br /> <br />stabil1 y on the type of transmission system assumed by Ur. <br /> <br /> <br />Sands. ro provid.G the quality of service required 1n a <br /> <br /> <br />large m tropolitan ~rea, the safe delivered capacity should <br /> <br /> <br />not mat rially exceed 120,000 kw. per circuit, which would <br /> <br /> <br />require at lea~t seven transmission circuits for primary <br /> <br /> <br />energy 0 ly. <br /> <br />11e it is true some allocation of investment in <br /> <br /> <br />. generati g capacity is allocable to secondary energy, this <br /> <br /> <br />conditio does not exist concerning transmission lines, for <br /> <br /> <br />their ca ~City is not a variable like generating capacity <br /> <br /> <br />which is affected by the head in the reservoir. rho mattor <br /> <br />A. B. Roberts <br /> <br />I <br /> <br />25. <br /> <br /> <br />, <br />,.; <br /> <br />} <br /> <br />.,j <br />.' <br /> <br />i <br /> <br />. <br /> <br />, <br />1 <br /> <br />, <br />
The URL can be used to link to this page
Your browser does not support the video tag.