My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08998
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:50:34 PM
Creation date
10/12/2006 3:24:14 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.200.05
Description
CRSP - Boulder Dam
Basin
Colorado Mainstem
Water Division
1
Date
10/31/1938
Title
Report of Competitive Value of Falling Water for Primary Energy at Boulder Dam in Competition with Steam Power at the Load Center
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />. <br /> <br />. <br /> <br /> <br />. <br /> <br />i <br /> <br />24. <br /> <br />~~ <br />> <br />~,~ <br />~ <br />CM, is <br />~ <br /> <br />six een units arc required du!'ihg periods of 10"1 '''ateI' it <br /> <br />rue that during periods of normal flow additional <br /> <br />cap. city is available in the units for generating second~ <br /> <br />'l.ry )nergy. :t, therefore, is possible that some equit- <br /> <br />!?,blo ch",rg,) should bo made to the genero.tion cost of <br /> <br />seco dary energy. <br /> <br />1,;1'. ,Sr.>nds used the maximum 'lnnual firm obligp,tions <br /> <br />in h s study, ~hich according to the contract is <br /> <br /> <br />4,27 ,000,000 k"'-hrs. occurring in the contract year of. <br /> <br /> <br />194) 4. rhe average annual obligation over the remain- <br /> <br /> <br />ing years of the contract period is 4,050,000,000 k~-hrs. <br /> <br /> <br />l'he a ount of secondary energy available is incapable of <br /> <br />exact determination but might bo estimated from a study of <br />the h drograph prepared by the Reclqmat~on Bureau in <br />AUgUB 1937, '''hich sho'78 qn estimated operation of the dam' <br /> <br />r,nd r. rwrvoir for future years., based upon actu9.l records <br /> <br /> <br />of ri ;r flo'" for the last 40 years. rhe economicR.l use <br /> <br /> <br />of the amount of secondl'try energy the,t "'ill be :wailable <br /> <br /> <br />i8 inc ~I'tblo of determination. <br /> <br />rhe osHmp, teil of future leilo'7'l. tt-hours and peale <br /> <br />dem?,nd nppoe.ring in my report on pp.ge 39 of the "Cfficie,l <br />Statom t of the Buru!lu of PO"ler and Light", dated <br />liovombe 30, 1937, as referred to in lejr. S'1nds' report, <br />rosul ts in an o.verage lop.d fs.c.tor of approximA.tely 50% <br /> <br />during , l5~ye~r period. ihesG ostimates ~ere intended to <br /> <br /> <br />bo cons rvative for the purpose of estimating future <br /> <br />A. J. Roberts <br /> <br />~ <br />:I,' <br /> <br />, <br />1 <br />-., <br />l <br />, <br />, <br />1 <br /> <br /> <br />"i <br /> <br />,:' <br /> <br />" <br />i <br />-,i <br /> <br />j <br /> <br />q <br /> <br />.i <br />, <br />* <br /> <br />,I <br />;} <br />~ <br /> <br />\ <br />j <br />'I <br />i <br />. ~' <br />f <br />, <br />-1- <br />,t <br />:1' <br />~. <br />1 <br />1 <br />! <br />
The URL can be used to link to this page
Your browser does not support the video tag.