My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08949
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08949
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:50:20 PM
Creation date
10/12/2006 3:22:45 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8147.100
Description
Arkansas River-Arkansas River Basin Water Projects-Gunnison-Arkansas Project
State
CO
Basin
Arkansas
Water Division
2
Date
6/15/1950
Author
PolicyReviewCommitte
Title
The Policy and Review Committee First Phase Gunnison-Arkansas Project
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />diversions for more efficient use during the irrigation season,. This <br /> <br />matter was discussed with the various Arkansas Valley interests and as <br /> <br />evidenced by appropriate resolutions, the people in the Arkansas Valley <br /> <br />have expressed a willingness to execute the necessary agreements to permit <br /> <br />the more efficient use of water now being diverted to their lands in the <br /> <br />winter months by storing such water in the Pueblo Reservoir. <br /> <br />Simi~ar resolutions were adopted by the local interests with <br /> <br />respect to the storage, TIhere possible, in project reservoirs in lieu of <br /> <br />inland reservoirs which have large evaporating areas. <br /> <br />The Committee agrees that the arr~ngements to secure more efficient <br /> <br />use of Arkansas River water and of flood waters to the extent that they can <br /> <br />be conserved are desirable and recolTll'\ends tllat the project be planned to <br /> <br />at tain these objectives. It was rec ogn~.zcd that agreements will reed be <br /> <br />executed to effectuate these uses. <br /> <br />P~'er Production <br /> <br />To assist in financing the project and to generate firm energy <br /> <br />needed in the Arkansas Valley, the projec,t. contemplates a system of p~'er <br /> <br /> <br />conduits and power plants located in the ~pper Arkansas Valley to develop <br /> <br />the power head between the outlet of the ~'rying Pan-Arkansas Twmel and <br /> <br />Salida. The successful operation of tllis power system requires the with- <br /> <br />holding of certain quantities of stor~e for power purposes at the end of <br />, <br />the irrigation season in the Sugar Loaf ~~ Twin Lakes Reservoirs in order <br /> <br />to insure the availability of water for fir power production in the winter <br />months. Storage so released is to be n-r~gulated in the Pueblo Reservoir <br />, <br />and exchanged during the l' ollovling S6Bsvn J:or storage in the upstream <br /> <br />['~90 <br /> <br />-4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.